Similar Projects
RFP - Professional Services - Storm Water Utility Study
Term Contract
Conception
Springfield, GA 31329

RFP Engineering - New Sanitary Sewer Force Main
Infrastructure
Conception
$2,000,000 CJ est. value
Rincon, GA 31326

Six Building Facilities - Effingham County
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Springfield, GA 31329

All Inclusive Playground Equipment
Infrastructure
Bidding
$90,000 CJ est. value
Guyton, GA 31312

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 LMIG Project
Results
Mount Vernon, GA

Blue Jay Road and McCall Road Realignment
Results
Rincon, GA

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

2021 Rincon TSPLOST Project: Georgia Avenue and Savannah Avenue
Demolition
Results
Rincon, GA 31326

Full Depth Reclamation of Ash Roads
Infrastructure
Post-Bid
GA

Early Street Sewer and Water Extension
Results
Springfield, GA 31329

Comprehensive Maintenance Services
Infrastructure
Post-Bid

2021 LMIG Safety Action Plan Project
Infrastructure
Results
GA

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Last Updated 09/13/2022 10:26 AM
Project Title

Hodgeville Road Lift Station

Physical Address View project details and contacts
City, State (County) Guyton, GA 31312   (Effingham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $3,520,533 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be bid consists of furnishing all materials, labor and equipment for: All Tools, Materials, Labor, Supervision, and Equipment for the Improvements of the Existing Effingham County Lift Station #4 Located on Hodgeville Road Including Purchase and Installation of the Prefabricated Booster Pump Skid, Odor Control Unit, Diesel Bypass Pumping System, Foundation, Electrical Controls Building, Paving, Drainage, Electrical and SCADA Work, Associated Force Main and Gravity Sewer Piping, Jack and Bore Installation and Connections, Valves, Demolition, Installation and Removal of Erosion Controls and Additional Auxiliary Equipment Required for an Operable Station, Grading, Spreading/Disposal of Excess Excavated Material, Traffic Control, Remove and Replace Signs, Remove and Replace Monuments, Tree Protection, Mobilization; Clean-Up, Insurance, Bonds and Other Miscellaneous Items not Specifically Listed But Necessary for A Complete Job. Any questions that arise after the pre-proposal conference must be made in writing and must be received at the office of the Purchasing Agent no later than 5.00pm (Eastern Time) on Monday, June 6, 2022. No response will be given to any questions received after 5.00pm (Eastern Time) on Monday, June 6, 2022. Questions may be faxed to 912-754-8413; emailed to abruton@effinghamcounty.org or mailed to the address above. If questions are mailed, please DO NOT put the bid number on the outside of the envelope. All proposals shall be accompanied by a BID BOND in favor of the Effingham County Board of Commissioners in the amount of at least five percent (5%) of the BID for the complete work. The BID BOND shall be forfeited to the Effingham County Board of Commissioners as liquidated damages if the BIDDER fails to execute the CONTRACT and provide PERFORMANCE BOND and PAYMENT BOND within fourteen (14) calendar days after being issued a Notice of Award. A Notice to Proceed will be issued immediately after the receipt of the signed Contract and P&P Bonds, and the Contractor is required to execute the NTP and begin work within fourteen (14) calendar days after signature and issuance of the NTP by the County The Completion Date for this Contract shall be within 270 calendar days from receipt of Notice to Proceed.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents