Similar Projects
L.B. Mcleod Road Bridge Over Shingle Creek No. 755800 Slope Protection Deficiency Repairs Phase 1
Infrastructure
Bidding
$319,440 est. value
Orlando, FL 32885

Retention Ponds Maintenance
Infrastructure
Bidding
Orlando, FL

Poitras East Master Infrastructure Phase 1B
Post-Bid
Orlando, FL

Andover Lakes Subdivision Underdrain Installation
Post-Bid
$1,699,115 est. value
FL

Drainage Repair
Results
Less than $400,000 est. value

Fuel Island Drain Installation
Results
Orlando, FL 32801

Orange County Cady Way Trail Drainage Improvements
Infrastructure
Bidding
$235,000 est. value
Winter Park, FL 32792

Poitras East Master Infrastructure Phase 1C and Centerline Drive Segment F
Post-Bid
Winter Park, FL

Lido Street Drainage Improvements
Results
Less than $1,371,623 est. value
Orlando, FL 32807

Lake Gandy Water Quality Improvement Phase I: Magnolia Village Construction
Infrastructure
Bidding
$400,000 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Orange County Underdrain Installation and Repair
Term Contract
Results
Less than $3,053,050 est. value
Orlando, FL

Pipe Liner - Drainage Repair
Infrastructure
Bidding
$1,308,180 est. value

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Forest City Road Drainage Project Phase II
Results
Orlando, FL 32801

Last Updated 08/16/2021 08:10 AM
Project Title

Camellia Gardens Subdivision Underdrain Installation

Physical Address View project details and contacts
City, State (County) Orlando, FL 32885   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,719,519
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new underdrains in the Camellia Gardens Subdivision, also includes the construction of underdrain cleanouts, replacement of driveway approaches and concrete curbs as specified, and roadway base and asphalt restoration at locations of underdrain diversion to the roadway.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents