Similar Projects
Well System Controls Improvements
Infrastructure
Bidding
Monterey, VA

Well Drilling Services
Term Contract
Bidding
Louisa, VA

Furnish and Install 2 Keen 5HP Pumps at State Farm Agribusiness
Post-Bid
Richmond, VA 23225

Cedar Ridge Well Lot
Post-Bid
Roanoke, VA

Open/Clean/Inspection of Wilden Diaphragm Pumps (OEM or Aftermarket Equivalent)
Results
Portsmouth, VA

Self Priming Water Pump
Results
Staunton, VA 24401

Pumping Services for Grease Traps
Infrastructure
Bidding
Virginia Beach, VA

Scroll Vacuum Pump
Post-Bid
Norfolk, VA

False Cape State Park Water System and Wash Woods Well Repairs
Results
Virginia Beach, VA 23456

Pump Maintenance, Repair Services, Parts and Equipment
Post-Bid
Norfolk, VA

Porter Valley Orphan Well Project
Results
$70,000 to $120,000 est. value
Chilhowie, VA

Construction of Town Center Fountains Pump Replacement
Post-Bid
Virginia Beach, VA

Manhole and Wet Well Rehabilitation and Related Services
Term Contract
Results
VA

Water Pump Test Stand HMI Installation & Configuration
Post-Bid
Portsmouth, VA 23709

Rehab Wet Well for Pump Station - Sewer Pump Station Repair
Results
Dillwyn, VA

Last Updated 01/20/2022 08:38 AM
Project Title

Pump Station No. 93 Pump Improvements

Physical Address View project details and contacts
City, State (County) Norfolk, VA 23502   (Norfolk City County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work under this Project consists of the removal and replacement of the City of Norfolk Pump Station No. 93 building and appurtenances located at 5822 Sellger Drive, within the same parcel. The existing wet well top slab will be removed and replaced and the existing wet well interior will be rehabilitated. The existing suction lift style pumps will be re-utilized and an additional suction lift style pump will be added. All existing force main will be replaced within the parcel before connecting to the existing 8” force main located within an existing easement at 5824 Sellger Drive.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents