Reported | 07/29/2022 12:00 AM |
Project Title | RFP Engineering - Lift Station A - Sewer Collection Tank Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Pope Valley, CA 94567 (Napa County) |
Category(s) | Heavy and Highway, Professional Services, Sewer and Water |
Sub-Category(s) | Architectural, Engineering, Lift and Pump Stations, Site Development, Storage/Water Tanks |
Contracting Method | Competitive Bids |
Project Status | Request for Proposals (RFPs), Construction Start Expected July 2023, |
Bids Due | View project details and contacts |
Estimated Value | $100,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Lake Berryessa Resort Improvement District (LBRID or District or Berryessa Estates) is seeking a qualified team (herein referred to as Contractor, or Consultant) to provide professional services and assist LBRID with the preparation of construction drawings, specifications, cost estimates, and other design documents necessary to replace a 20 year old 91,000 gallon bolted steel sewer collection tank located at Sewer Lift Station "A" - 2446 Stagecoach Canyon Road, Pope Valley, CA 94567. The scope of engineering services is described further in Section C of the Request for Proposals (RFP). Information contained in this RFP is LBRID's best understanding of existing tank and site conditions, including previous drawings and specifications used in 2002 to replace the original tank installed in 1967 and modified in the 1990's. LBRID values the opinions of Firms with sewer tank expertise. If the Firm believes there is a better alternative to achieve LBRID's goals then that should be reflected in the proposal and is requested as part of Task 2 below. Deadline to Submit Questions for Clarification July 14, 2022 Questions regarding this RFP should be sent via email or fax to: Annamaria Martinez, Assistant Engineer (Contact Information - Page 5) The method of contractor selection has not been determined at this time. |
||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |