Similar Projects
Comprehensive Infrastructure for Tampa's Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Private Lateral Line Rehabilitation Project
Post-Bid
Saint Petersburg, FL 33731

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

On-Call Plumbing/Sewer and Drain Services
Results
Tallahassee, FL 32312

Grand Ridge Sewer Extension Hwy 69
Results
Grand Ridge, FL 32442

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Sanitary Sewer Capacity Improvements
Results
Less than $15,000,000 est. value
Saint Pete Beach, FL 33706

SR 20 Forcemain Upgrade - Lafayette L.S. to South Jackson Street and US-331 Forcemain Repair at Jolly Bay Road
Post-Bid
Santa Rosa Beach, FL

Grease Trap, Septic Tank and Storm Drainage Pump-Out and Repair Services
Term Contract
Results
Miami, FL

Glades County Community Development Block Grant Project Washington Park Sanitary Improvements
Post-Bid
$550,000 est. value
FL

Maintenance of Stormwater and Sanitary Sewer Structures
Results
Less than $150,000 est. value
North Miami, FL 33161

US-98 Sanitary Force Main Improvements
Post-Bid
$600,000 to $700,000 est. value
Sebring, FL 33876

Sanitary Sewer Cleaning and CCTV
Results
Less than $110,000 est. value
Miami, FL 33155

Grates, Boxes, Manholes
Results
De Land, FL 32720

Forcemain 30A Replacement
Results
Less than $55,520,166 est. value
Bradenton, FL 34205

Last Updated 05/26/2021 03:36 PM
Project Title

Lift Station 10 Force Main Replacement Project

Physical Address View project details and contacts
City, State (County) Bradenton, FL 34205,   (Manatee County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of approximately 850 linear feet (LF) of 14-inch force main with both 16-inch high-density polyethylene (HDPE) and polyvinyl chloride (PVC). The project will be constructed within the right-of-way of 3rd St W between Manatee Ave W and 8th Ave W. The new force main will primarily be constructed using horizontal directional drilling, with approximately 100 LF of open-cut sections. The project includes connection to existing isolation valves and manholes, installation of air-release valves, and careful coordination of existing utilities in the project area.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents