Similar Projects
Courthouse Renovation
Renovation
Conception
Northwood, IA

City Hall Annex - City of Des Moines
New Construction, Infrastructure - 56,000 SF
Conception
$36,000,000 CJ est. value
Des Moines, IA 50309

Mills County Courthouse Restroom Remodel
Build-out
Design
$10,000 CJ est. value
Glenwood, IA 51534

Mahaska County Courthouse HVAC Replacement
Renovation
Bidding
Oskaloosa, IA 52577

Polk City New City Hall
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Polk City, IA 50226

Courthouse Front Steps
Renovation
Post-Bid
Burlington, IA 52601

Hancock County Courthouse Exterior Repairs - Rebid
Infrastructure, Renovation
Post-Bid
$500,000 CJ est. value
Garner, IA 50438

City Hall Security
Renovation
Results
$260,000 to $450,000 est. value
Pleasant Hill, IA

City Hall Remodeling & Repurposing
Renovation
Results
Less than $3,900,000 est. value
Cedar Falls, IA 50613

Courthouse Repairs - County Of Hancock
Build-out
Pending Verification
$1,600,000 CJ est. value
Garner, IA 50438

City Hall Expansion (2nd Floor) - ADMN-18-001 - City of Norwalk
Addition
Conception
$700,000 CJ est. value
Norwalk, IA 50211

Window Replacement at Iowa County Courthouse
Renovation, Alteration
Post-Bid
$800,000 est. value
Marengo, IA 52301

Courthouse Tower Rehabilitation
Renovation
Results
Decorah, IA 52101

Courthouse Exterior Renovations
Renovation
Post-Bid
Marengo, IA 52301

Clerk of Court Renovations Project
Renovation
Results
$900,000 est. value
Iowa City, IA 52240

Last Updated 03/09/2023 04:09 PM
Project Title

Johnson County Courthouse Second Level South - Floor Replacement and Third Level Renovation

Physical Address View project details and contacts
City, State (County) Iowa City, IA 52240   (Johnson County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,817,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is described in general as: the floor replacement at the second level south and office renovations on the third level. Structural, architectural, and mechanical and electrical work is included. Offers shall be on a stipulated sum basis for a single General Construction Contract, including respective civil, mechanical, and electrical work; segregated bids will not be accepted. Bid Security in the amount of five percent (5%) of the bid must accompany bid in accordance with the Instructions to Bidders. Products and materials incorporated in the Work of this Project are Exempt from Iowa sales tax and local option sales tax. Performance Bond and Labor and Material Payment Bond will be required in the full amount of the contract. The Work under this Contract shall have limited on-site access. Mobilization for Work on-site shall begin no earlier than Monday October 3, 2022 and be completed, with all equipment placed in operation, on or before the anticipated Substantial Completion Date of Monday April 3, 2023, subject to an extension of time which may be granted by the Owner. The Owner reserves the right to reject any or all bids, to waive irregularity in the bids and in the bidding and to enter into such contract as shall be deemed to be in the Owners best interest

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents