Similar Projects
Last Updated | 11/15/2022 04:01 PM |
Project Title | South Highline Canal Near Allen Creek - DO6385 - City Of Grants Pass |
Physical Address | View project details and contacts |
City, State (County) | Grants Pass, OR 97526 (Josephine County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,150,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project will regrade and resurface the canal between Wagon Wheel Drive and Allen Creek to provide better flow and additional capacity. Catch basins will be installed to collect flows currently accepted by the channel. Concrete should be added to the bottom and sides of the channel under the bridge and immediately upstream of this section to increase flow capacity. This project will be jointly funded by the City and the Grants Pass Irrigation District. This project is included in the city's FY 2023-2024 Capital Improvement Plan. As of November 15, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |