Similar Projects
Attessa Motorsports Complex Master Plan
New Construction, Alteration
Conception
Casa Grande, AZ 85193

Attesa Motorsports Complex - Garages & Paddock
New Construction
Design
Casa Grande, AZ 85193

Papago Plaza - Retail Space and Parking Garage - SIte
New Construction, Demolition - 208,000 SF
Design
$11,000,000 to $16,000,000 est. value
Scottsdale, AZ 85257

Bouse Kofa Dome Tap Gila Reconductoring Construction Project
Infrastructure
Bidding
Yuma, AZ

Land and Grubbing for the San Carlos Apache Tribal Farm Expansion Project
Infrastructure
Bidding
Bylas, AZ

Cactus Middle School Site Improvements
Post-Bid
Casa Grande, AZ 85122

Site Preparation for AMARG Tension Fabric Structures
Post-Bid
Tucson, AZ 85707

Off-Highway Vehicle Staging Area
Results
Less than $680,000 est. value
Quartzsite, AZ

GVID Standpipe Site Improvements Project
Results
$88,500 est. value
Kingman, AZ

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Merkin Vineyards Grading and Site Utilities Phase I
New Construction
Construction
Cottonwood, AZ

Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

Fairgrounds Site Improvements Phase 1
Infrastructure
Bidding
$100,000 est. value
Globe, AZ 85501

Green Valley Park ADA Site Improvements
Post-Bid
Payson, AZ

Rockfall Mitigation
Results
Less than $3,500,000 est. value
Bisbee, AZ

Reported 06/04/2022 12:00 AM
Project Title

Naco AZ Drilling Effort

Physical Address View project details and contacts
City, State (County) Naco, AZ   (Cochise County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Naco, Arizona. Completed plans call for site work for a water / sewer project. Disclosure of the Size of Construction Project: Between $500,000 and $1,000,000 All Questions are due NLT 20 May 2022 by 1400 CST. Proposals are due NLT 03 June 2022 by 1400 CST. See 3.2.2.3-63 SITE VISIT (CONSTRUCTION) (JUL 2004) for site visit POC. NOTE: Please notify the Contracting Officer, NLT 09 May 2022, if the offeror would like to request a site visit. The United States Border Patrol (USBP) requires geophysical surveying and mapping services to perform cone penetration testing (CPT) (or acceptable substitute), deploy a variety of geophysical surveying technologies, drill up to twenty-five (25) uncased twenty-four-inch (24") diameter boreholes up to one-hundred-feet (100') deep, drill up to two lined forty-two-inch (42") diameter boreholes up to one-hundred- feet (100') deep, and provide earth-moving equipment to manage the drilling spoils and aid with geophysical surveying. The work will be completed at specific locations as directed by DHS personnel within the Naco, AZ Port of Entry area. The Contractor shall perform ten (10) CPTs to a depth of one-hundred (100') feet at specific locations as indicated by USBP/CBP representative. The contractor shall deploy magnetometer based sensors, electrical resistivity sensors or a probe based camera at the direction of USBP/CBP representative to record data as a function of depth. All recorded data along with locations of each test to sub-centimeter accuracy GPS coordinates shall be delivered at completion of project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents