Similar Projects
Palm Coast Library Driveway and Parking - Flagler County
Infrastructure
Conception
$435,000 CJ est. value
Palm Coast, FL 32137

Palm Coast Library Driveway and Parking - Flagler County
Infrastructure
Conception
$435,000 CJ est. value
Palm Coast, FL 32137

The Tribute
New Construction - 5,000 SF
Design
Palm Coast, FL

Villas of Tomoka
New Construction
Design
$46,395,600 CJ est. value
Ormond Beach, FL 32174

Colo 2B Utility Building
Renovation, Infrastructure
Bidding
$321,200 CJ est. value
Palm Coast, FL 32137

Raw Water Main Extension- WTP #3 Wellfield
Infrastructure
Bidding
$2,100,000 CJ est. value
Palm Coast, FL 32137

Hargrove Grade Road Reconstruction - Flagler County
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bunnell, FL 32110

Hargrove Grade Road Reconstruction - Flagler County
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bunnell, FL 32110

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

Silicone Joint Sealer
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Pointe Grand Apartments
New Construction
Construction
Palm Coast, FL

Plantation Bay Section 2A-F Unit 16
New Construction, Infrastructure
Pending Verification
$29,000,000 CJ est. value
Bunnell, FL 32110

Par Builders Storage
New Construction, Infrastructure - 103,255 SF
Pending Verification
$11,000,000 CJ est. value
Bunnell, FL 32110

SR 100 from N. Palmetto ST to Old Kings Rd South - Florida Department of Transportation
Infrastructure
Conception
$9,500,000 CJ est. value
Bunnell, FL 32110

Last Updated 05/10/2023 03:13 PM
Project Title

Cameron

Physical Address View project details and contacts
City, State (County) Palm Coast, FL 32137   (Flagler County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $92,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope details have not been released. As of May 10, 2023 the project is in planning stage. Engineering plans are in revision. Information regarding the architect, general contractor and method of selection has not been disclosed. A construction timeline has not been determined, but is not expected to start before July 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents