Similar Projects
Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

Flats at Twenty
New Construction, Infrastructure
Conception
$81,500,000 CJ est. value
La Grange, KY 40031

Salt Storage Bid
New Construction, Infrastructure
Design
$362,000 CJ est. value
La Grange, KY 40031

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Markers and Reflectors
Infrastructure
Post-Bid
$600,000 CJ est. value
Richmond, KY 40475

Painting, Repairs, Modifications, Elevated tank
Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
La Grange, KY 40031

Springs Park - Phase 1 Site Improvements
Renovation, Infrastructure
Results
La Grange, KY 40031

Kitchen Drain Line Repair/Replacement
Infrastructure
Results
$2,035,000 CJ est. value
La Grange, KY 40031

Parkside Estates
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
La Grange, KY 40031

Sanctuary Falls Phase 2
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Crestwood, KY 40014

Roederer Correctional Complex (RCC) Range House
New Construction, Infrastructure - 1,950 SF
Post-Bid
$1,080,000 CJ est. value
La Grange, KY 40031

John Back Aquatic Center Pool Renovation
Infrastructure, Renovation
Results
$700,000 CJ est. value
La Grange, KY 40031

Bishop Place Apartments
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
La Grange, KY 40031

South Oldham High School Football Field Lighting
Infrastructure
Post-Bid
$140,000 CJ est. value
Crestwood, KY 40014

Crestwood Properties
New Construction, Infrastructure
Pending Verification
$850,000 CJ est. value
Crestwood, KY 40014

Last Updated 03/09/2023 11:05 AM
Project Title

Sewage Pump Replacement Luther Luckett Correctional Complex La Grange, Kentucky

Physical Address View project details and contacts
City, State (County) La Grange, KY 40031   (Oldham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $749,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the removal and replacement of the sanitary sewage comminutor serving the sanitary system of two dormitories and a guard tower. Contractor shall provide a hard-piped bypass and separate overflow of the comminutor to provide ease of maintenance on the comminutor. Bypass shall consist of multiple gate valves. Overflow shall consist of open pipe with removable trash guard. Existing incoming sanitary sewer shall be intercepted and reworked to accommodate installation of new manholes and comminutor. Provide new control panel, alarms, and level monitoring for comminutor. Existing water main to be relocated to accommodate new sanitary work. Contractor to verify size, location, and inverts of all utilities. All work will be performed inside the Security Boundary.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents