Similar Projects
Pax Ave Bridges
Infrastructure
Design
$830,000 CJ est. value
Lansing, WV 25862

Belva Rd
Infrastructure
Design
$1,264,000 CJ est. value
Fayetteville, WV 25840

Milburn Bridge
Demolition, New Construction, Infrastructure
Bidding
$17,500,000 CJ est. value
Scarbro, WV 25917

Asphalt Paving - Old Rte 38
Infrastructure
Bidding
$650,000 CJ est. value
Fayetteville, WV 25840

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Fayette County Schools Various Projects - Esser Fund Projects - Outdoor Classrooms
New Construction, Infrastructure
Post-Bid
$2,271,000 CJ est. value
Fayetteville, WV 25840

Horse Creek and Town Creek Water Project
Infrastructure
Results
$743,540 CJ est. value
Pax, WV 25880

Horse Creek and Town Creek Water Project
Infrastructure
Results
$743,540 CJ est. value
Pax, WV 25880

Meadow River Trail Russellville Bridge Replacement
Demolition, New Construction, Infrastructure
Construction
$981,245 CJ est. value
Fayetteville, WV 25840

Chapline Hill Rd +3
Infrastructure
Design
$459,000 CJ est. value
Montgomery, WV 25136

Structure Renovation - Glade Fork Bridge
Infrastructure
Bidding
$1,500,000 CJ est. value
Meadow Bridge, WV 25976

RFP Engineering - Restoration and Rehabilitation of Public Infrastructure
Infrastructure
Post-Bid
$1,325,000 CJ est. value
Smithers, WV 25186

EQ Basin Project Contract 1 - Lift Station and Force Main Improvements
Renovation, Infrastructure
Results
$1,113,900 CJ est. value
Mount Hope, WV 25880

RFP D/B - I-77 over Route 606 Bridge Replacement Design-Build Project
Demolition, New Construction, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Kingston, WV 25917

Meadow Bridge Regional School Phases II and III
Addition, Demolition, Infrastructure
Results
$15,375,000 CJ est. value
Meadow Bridge, WV 25976

Last Updated 12/18/2023 02:33 PM
Project Title

Phase II Sanitary Sewer and Stormwater Separation Project

Physical Address View project details and contacts
City, State (County) Smithers, WV 25186   (Fayette County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected December 2021
Bids Due View project details and contacts
Estimated Value $889,815 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The approximate quantities of work to be bid upon are described as follows: 1 LS Mobilization/Demobilization; 1 LS Erosion and Sediment Control; 1 LS Videotaping of Project Area; 570 LF 24" HDPE Storm Line; 305 LF 15" HDPE Storm Line; 655 LF 14" HDPE Storm Line; 275 LF 12" HDPE Storm Line; 25 LF 10" HDPE Storm Line; 950 LF 8" PVC SDR 35 Gravity Sewer Line; 305 LF 6" PVC SDR 35 Gravity Sewer Line; 1,165 LF 8" D.I. Gravity Sewer Line; 260 LF 4" PVC Service Lateral Piping; 175 LF 4" DIP Service Lateral Piping; 85 LF 36" Steel Casing (Bore & Jack); 125 LF 16" Steel Casing (Bore & Jack); 25 LF 30" Steel Casing (Open Cut); 35 LF 24" Steel Casing (Open Cut); 25 LF 20" Steel Casing (Open Cut); 25 EA 48" Diameter Sanitary Manhole Base, Cone Top, Watertight Casting & Lid; 1 EA Remove & Replace 48" Diameter Sanitary Manhole Base, Cone Top, Watertight Casting & Lid; 10 EA 48" Diameter Storm Manhole Base, Cone Top & Lid; 1 EA Remove Existing Drop Inlet & Replace with 48" Diameter Storm Manhole Base, Cone Top & Lid; 2 EA Regrout Existing Manhole; 10 EA New Drop Inlet; 15 EA Remove & Replace Drop Inlet; 35 VF 48" Diameter Concrete Manhole Riser Pipe; 2 EA 8" Gravity Terminal Line Cleanout; 1 EA 6" Gravity Terminal Line Cleanout; 2 EA Connect to Existing Manhole; 1 EA Connect to Existing Drop Inlet, 25 EA Reconnect Customer Service Lateral; 1 LS Storm Sewer Outfall; 685 LF WVDOH Type "A" Trench Repair w/ Full-Width 2" HMA Overlay; 240 LF WVDOH Type "B" Trench Repair; 85 LF WVDOH Type "C" Trench Repair; 40 LF Driveway Repair (Gravel); 210 LF Concrete Sidewalk Repair; 985 LF 2" HMA Overlay; $4,549.50 WVDOH Inspection Fee Allowance; 65 LF Privacy Fence. The Work will be substantially completed within 240 days after the date when the Contract Times commence to run, and completed and ready for final payment within 270 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000/day. Envelope No. 1 must have the following information presented on the front: Name and address of Bidder Bid on - Contract #1 - Phase II Sanitary and Stormwater Separation Project Received by Smithers Sanitary Board Envelope No. 2 labeled "Bid Proposal" shall also be placed inside of Envelope #1. Envelope No. 1 will be opened first and the Bid Opening Requirement items checked for compliance as outlined on the Bid Opening Checklist on page BOR - 1 of these contract documents. If such documents are found to be in order, Envelope No. 2 "Bid Proposal", will then be opened and will be publicly read aloud. If the documents required to be contained in Envelope No. 1 are not in order, Envelope No. 2 "Bid Proposal" will not be opened and the Bid will be considered non-responsive and will be returned to the Bidder. Any contract or contracts awarded under this invitation for Bids are expected to be funded in part by grants and loans from: the West Virginia Department of Environmental Protection State Revolving Fund. Neither the United States, the State of West Virginia nor any of their departments, agencies, or employees are or will be a party to this invitation to Bid or any resulting contract. Bids shall be accompanied by a certified check or Bid Bond payable to the City of Smithers Sanitary Board, for an amount equal to five percent (5%) of the Total Bid. Bidders must hold a current West Virginia contractor's license on the date of Bid Opening. Contractors are required to comply with all laws pertaining to prevailing wage rates for the federal wage rates issued in accordance with the Davis Bacon Act. The Smithers Sanitary Board reserves the right to reject any and all Bids. CWSRF #C-544583 WVIJDC #2020S-1871 Last day for receiving Contractor questions will be COB Tuesday, October 26, 2021, at 5:00 p.m. Please submit all questions in writing via email to rboustany@thethrasherugsm.com and/or ifadiga@thethrashergroup.com, via fax at 304-343-7604 Attn: Ryan Boustany.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents