Similar Projects
Sanitary Sewer Phase 2
Infrastructure
Bidding
$1,000,000 est. value
Assumption, IL

Removal of the Existing Structure, Construction of a Three Span Reinforced Concrete Slab Bridge, Drainage Improvements
Infrastructure, Alteration
Bidding
$700,000 est. value
Manteno, IL

Pipe, Bands, and End Section
Post-Bid
IL

Furnishing Various Diameters and Lengths of Galvanized Corrugated Steel Culvert Pipe and Precoated Galvanized Corrugated Steel Culvert Pipe
Post-Bid
IL

Replacing a Gabion Wing Wall on Sn 100-5002 at the Intersection of Herrin Road and Collins Road Near Johnston City
Results
Johnston City, IL 62951

Removal and Replacement of A Box Culvert (SN 033-7024) Carrying Il 142 Over A Ditch, 0.1 Miles North of Main Street in Broughton
Results
Broughton, IL 62817

Riprap Placement, Guardrail Removal and Replacement, Expansion Joint Replacement
Infrastructure
Bidding
$500,000 est. value
Sycamore, IL 60178

Sanitary Sewer Relocation
Post-Bid
Bradley, IL

20-06 South Shores Sewer Rehabilitation
Renovation
Results
Decatur, IL

Patching, Milling, Resurfacing, Guardrail Replacement and Culvert Replacements on US 36
Infrastructure
Bidding
$2,000,000 est. value
Decatur, IL 62523

Construction Single Span Bridge
Renovation
Post-Bid
Marion, IL

CSO Sewer Separation Project - Phase 5
Results
Gibson, IL

Roseville High School Parking Lot Bioretention Basin Retrofit
Infrastructure
Bidding
$175,000 est. value
Monmouth, IL 61462

Civic Apartments Water and Waste Line Replacement
Alteration
Post-Bid
Sycamore, IL 60178

Wyckles Facility Sludge Inlet Repairs
Results
Decatur, IL

Reported 05/18/2022 12:00 AM
Project Title

Hillcrest Drainage Improvements Project

Physical Address View project details and contacts
City, State (County) Mechanicsburg, IL 62545   (Sangamon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of installing 132 feet of new 24" storm sewer, 14 feet of 18" storm sewer, 15 feet of 12" storm sewer, 2 each of new manholes, removal and replacement of riprap, earth excavation including 207 cu yd furnished earth excavation, resetting 2 existing 12" culverts, ditch grading and shaping and seeding.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Riprap.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents