Similar Projects
Del Webb Server Room
New Construction
Conception
Salem, OR 97301

Hub City Village
New Construction - 9,300 SF
Design
$2,400,000 est. value
Albany, OR

New Homeless Shelter
New Construction - 7,423 SF
Design
$270,000 est. value
Roseburg, OR 97470

NAVFAC Northwest 8(a) Small Multiple Award Construction Contract (MACC) Regional Contract
New Construction, Renovation, Demolition, Alteration
Bidding
$10,000,000 to $100,000,000 est. value

NAVFAC Northwest 8(a) Small Multiple Award Construction Contract (MACC) Regional Contract
New Construction, Renovation, Demolition, Alteration
Bidding
$10,000,000 to $100,000,000 est. value

CAMS(Capitol Accessibility Maintenance and Safety) Phase III BP #3 - Demo, Concrete and Excavation
Demolition, Renovation, Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Salem, OR 97301

15 KVA and 25 KVA Transformers
Term Contract
Sub-Bidding
Deer Island, OR 97054

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Capital Improvements Baker City Employment Office
Renovation
Results
$845,500 est. value
Baker City, OR 97814

USPS IQ JOC Oregon
New Construction, Renovation
Results
Less than $10,000,000 est. value

Leson Subdivision
New Construction
Pending Verification
$9,000,000 est. value
Grants Pass, OR 97527

RFP Construction Manager - Construction Manager/General Contractor Services - Renovation of the Executive Building
Renovation
Design
$43,000,000 CJ est. value
Salem, OR 97301

Construction Manager - Construction Manager / General Contractor (CM/GC) - Operation Command Center
New Construction
Bidding
$8,200,000 est. value
Eugene, OR

On Call Facilities Maintenance Services
New Construction
Post-Bid
Hillsboro, OR

Last Updated 07/28/2022 01:06 PM
Project Title

US Fish and Wildlife Service Quarters Maintenance

Physical Address View project details and contacts
City, State (County) Princeton, OR 97721   (Harney County)
Category(s) Government/Public, Residential, Single Trades
Sub-Category(s) Flooring, Misc. Buildings, Single-Family Homes
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $75,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All inquiries requesting information should be in writing sent via mail to tariq_malveaux@fws.gov Period of Performance: 08/04/2022 to 01/31/2023 Range of Magnitude is between $15,000 and $75,000. Remove and correctly dispose of approximately 1,358 square feet of sheet vinyl and carpet including padding, tac strips, nails, and staples. Prepare wood subfloor for installation of vapor barrier and Locking Vinyl Tile (LVT). LVT must be natural wood pattern and light in color and tone, color must be approved by COR (suggested specs below). Purchase and install LVT throughout the house (Approximately 1,358sqft) Vinyl orientation will be determined on site for best appearance, utilization of product, and approved by COR prior to installation. There are five (5) exterior doorways that will meet the newly installed flooring. Weather stripping to prevent water from entering and damaging flooring is a must. There are six (6) internal doors. Internal doorways transition shall be smooth as all rooms are getting identical flooring. Remove base board to permit proper installation of flooring. Baseboard that is not damaged may be reused and re-installed; if baseboard is damaged, it shall be replaced with material matched as closely as possible in appearance and composition to the existing color, size, and shape. Remove base board heaters and properly disconnect from power source. Replace with base board molding to match existing material as closely as possible in appearance and composition to the existing color, size, and shape. Remove wood stove and pipe, repair ceiling and metal roof. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings.
Division 13 - Special Construction, Kennels and Animal Shelters.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents