Similar Projects
Garden Plain Bentwood Addition
Infrastructure
Bidding
$2,000,000 CJ est. value
Garden Plain, KS 67050

North Lift Station Improvements
Demolition, Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Hiawatha, KS 66434

Piping Improvements and Water Meter Replacement
Renovation, Infrastructure
Post-Bid
Less than $1,250,000 est. value
Wichita, KS 67205

2022 JCPRD Mechanical and Plumbing Services IDIQ
Term Contract
Post-Bid
KS

Facilities Management - (Electrical, Plumbing, Painting, Carpentry, HVAC ,Trenching and Masonry)
Term Contract
Results
KS

On-Call Plumbing Services
Term Contract
Results
De Soto, Edgerton, Gardner, Leawood, Lenexa, Merriam, Mission, New Century, Olathe, Overland Park, Prairie Village, Roeland Park, Shawnee, Spring Hill, KS 66061

Jefferson County Jail Phase 1 Plumbing Fixture Replacement
Alteration
Post-Bid
$250,000 to $500,000 est. value
Oskaloosa, KS 66066

Oak Park/Century Estates Storm Drainage Improvements
Infrastructure
Results
$3,053,477 CJ est. value
Lenexa, KS 66215

Temporary Bypass Pumping On-Call
Alteration
Post-Bid
Olathe, KS

Booster Pump Station Improvements
Infrastructure
Results
$92,326 CJ est. value
Wolf Creek, KS 67481

Prairie Band Potawatomi Nation (PBPN) Health Center - Low Flow Water Saving
Alteration
Post-Bid
$400,000 est. value
Mayetta, KS 66509

Morton Road 6" Waterline Project
Infrastructure
Results
$699,488 CJ est. value
Atchison, KS 66002

Streambank Stabilization work at John Redmond #2
Infrastructure
Post-Bid
$250,000 CJ est. value
Burlington, KS 66839

Contract 1: Raw Water Transmission Pipeline Contract 2: 56th and Kincaid Pipeline
Infrastructure
Results
$1,242,620 CJ est. value
Topeka, KS 66612

Basehor Civic Campus - Mass Grading Project
Infrastructure
Post-Bid
$65,000 CJ est. value
Basehor, KS 66007

Last Updated 02/08/2023 01:07 PM
Project Title

Water Treatment Plant Expansion Project - Phase II Rural Water District #2

Physical Address View project details and contacts
City, State (County) Paola, KS 66071   (Miami County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $15,998,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the construction of the Miami RWD #2 Water Treatment Plant Expansion - Phase II will generally include the following but will not be limited to: mobilization of facilities, equipment and materials; construction staking; clearing and grubbing; demolition, earthwork, excavation, construction of clearwell complex; construction of chlorine contact bulding canopy and lab; construction of high service pump building and systems; installation of electrical service and electrical equipment; installation of 24" DIP Miami RWD #2 central finished water line and connection to distribution piping; installation of 12" DIP Miami RWD #2 west finished water line and connection to distribution piping; installation of 20" DIP Johnson #7 finished water line and connection to distribution piping; installation of 16" backwash line and connection to existing main and connection to distribution piping; installation of process piping; installation of chemical feed line and connection to existing injection point; installation of 6" plant water serivce line; installation of P.O.E. and raw water sampling lines to lab; installation of septic holding tank and associated gravity sanitary sewer main; installation of process waste and sanitary sewer drain lines; installation of french drain piping system; installation of overflow piping and associated structures and connection to existing process waste; installation of chlorine and ammonia tanks systems; remove existing chlorine contact basin from service; complete general site work and finish grading, seeding and mulching; construction gravel roads; construct block retaining wall system; construction 8" concrete pavement; grade ditches to drain; construct and install stormwater structures and associated piping; coordinate with Micro-Comm to supply SCADA communications to proposed buildings; coordinate with Gobrolly Internet to coordinate internet to proposed buildings; coordinate with Owner for connections to existing facilities piping and processes; demolition of existing high service and transfer pumps and associated piping and electrical system; removal of existing above grade ground storage tank from service and installation of equipment from equipment procurement contract. Submit all questions about the meaning or intent of the Bidding Documents to Hannah Lovy of Midwest Engineering Group, LLC in writing or email hlovy@midwest-engineers.com.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents