Similar Projects
Garth Road Reconstruction - Water/Wastewater - Phase A and B
Infrastructure
Bidding
$111,527,204 CJ est. value
Baytown, TX 77521

Baytown Sidewalk Project Phase II
Infrastructure
Bidding
$200,000 CJ est. value
Baytown, TX 77520

Construction of Parkland Village Section 46 - LS Improvements, Recreational Facilities
Alteration
Post-Bid
TX

2022 Annual Sidewalk Improvements Phase II
Term Contract
Post-Bid
Pasadena, TX 77506

Concrete Ready Mix 80 LB Bag
Results
$1,693 est. value
Houston, TX

Ready-Mix Concrete and Related Items for Harris County Precinct 3 (Bonfire)
Alteration
Results
Houston, TX

Type B and Type D Hot- Mix Hot Laid Asphaltic Concrete Material and Related Items for Harris County Precinct 3
Term Contract
Post-Bid
Houston, TX 77020

Formal - CSB - Annual Concrete Replacement at Turning Basin Terminal 2021-2022
Term Contract
Results
$1,503,925 est. value
Houston, TX

Water, Sanitary Sewer, and Drainage Facilities to Serve Sienna Section 64
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Katy, TX 77493

District Wide Concrete Services
Alteration
Results
Houston, TX

Construct 12 Acre Expansion of an Interim Container Storage Facility for the Redevelopment of the West End of Barbours Cut Terminal
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Houston, TX 77002

Concrete Joint Cleaning Replacement and Related Items for Various Locations Precinct 1
Alteration
Results
TX

Construction of Hardscape Improvements for The Highlands Sundew Park
Infrastructure
Post-Bid
$400,000 CJ est. value
Highlands, TX 77562

Ready Mix Concrete U - Cart and Curbside Cement
Term Contract
Results
Pasadena, TX

Paving Facilities in Sunterra Section 32
Infrastructure
Post-Bid
$200,000 CJ est. value
Katy, TX 77493

Last Updated 01/17/2023 02:49 PM
Project Title

Champions North and Northwest Water Line Rehabilitation

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $4,317,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work in this contract is for the Champions North & Northwest Water Line Rehabilitation for Champions Municipal Utility District (Champions MUD) located in Harris County, Texas. The purpose of this project is to replace aging water lines in the Champions North & Northwest neighborhoods and along Champion Forest Drive, including gate valves and fire hydrants, to prevent future water main breaks in the area. Installation of 6-inch, 8-inch, and 12-inch AWWA C-900 water line, by trenchless construction, for all depths, including restrained joints, bends, fittings, open right gate valves with boxes, and Mueller, or approved equal, fire hydrant assemblies. Disinfection and hydrostatic testing shall be completed by the Contractor. Installation of minimum 14-inch and 20-inch steel casing, by trenchless construction, including fittings. Contractor shall make sure proposed water line with restrained joints and spacers has the needed clearance for installation inside the proposed steel casing. Connection of the new water lines to the existing water system by tapping sleeve and valves and wet connections. Installation of 8-inch and 12-inch gate valves. Contractor shall install valve extensions for valves deeper than 8 feet. Installation and connection of new long-side and short-side service leads, all diameters, from new water line to existing residential water meters using tapping saddle with stainless steel band, including Accurate Meter or Core and Main corporation valves and ball valve curb stops, or approved equal, with u-branches or standard compression fittings at the meter connection. Service lines for inch water meters shall be a single 1-inch service line with a 1-inch by inch u-branch for two meters or standard compression fitting for one meter. Service lines for water meters 1-inch and larger shall be a single line that matches meter size for each meter. No 90-degree curb stops will be allowed. It will be the Contractors responsibility to ensure that all residential meters are reconnected to the new water line. Installation and connection of new service leads, to match existing service lead diameter, from the new water line to the existing commercial water meters and irrigation water meters using stainless steel tapping saddle or sleeve including Accurate Meter or Core and Main corporation valves and ball valve curb stops, or approved equal. No 90-degree curb stops will be allowed. It will be the Contractors responsibility to ensure that all commercial and irrigation meters are reconnected to the new water line. Abandonment of existing water lines, all sizes, all depths, including cutting, draining, plugging, and grouting the existing water line as shown in the plans. Removing existing fire hydrant assemblies and plugging the old fire hydrant connection on the existing line. Existing fire hydrants that are removed are to be salvaged and returned to Champions MUD. Installation of air release and vacuum relief valve manhole. Site restoration of Champions Golf Club Property and Harris County Right of Way disturbed areas including replacing damaged sidewalks, ramps, driveways, pavement, turf, plants, shrubs, trees, irrigation lines, fences, and gates. Implementation, maintenance, and removal of traffic control plan, trench safety, and storm water pollution prevention plan best practices including inlet protection barriers. Reconnection of fire line service taps, to match existing diameter, from the existing lead to the new water line using tees or tapping sleeve and valves. It is the Contractors responsibility to ensure that all fire lines are reconnected to the new water line. After the fire line has been connected to the new water line, the Contractor will be required to have the buildings fire system tested to ensure the fire system is working properly. All bids should include the number of calendar days that are expected to complete the work. If the bid does not state the number of calendar days, then a value of 270 days will be assumed and entered into the Standard Form of Agreement.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents