Similar Projects
Huff Bridge
Demolition, New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Pine Grove, WV 26419

Huff Bridge
Demolition, New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Pine Grove, WV 26419

Pedestrian/bike Facilities - Jacksonburg - Reader +7
Infrastructure
Bidding
$900,000 CJ est. value
Jacksonburg, WV 26377

Pedestrian/bike Facilities - Jacksonburg - Reader +7
Infrastructure
Bidding
$900,000 CJ est. value
Jacksonburg, WV 26377

Flue Gas Baghouse Replacement (Phase 2) Project
Infrastructure
Post-Bid
$100,000 CJ est. value
Paden City, WV 26159

Pool Resurface - Lewis Wetzel Swimming Pool
Infrastructure
Post-Bid
$280,000 CJ est. value
New Martinsville, WV 26155

Bridge Expansion Joint Repair System Emseal 6622C008
Renovation, Infrastructure
Results

Bridge Expansion Joint Repair System Silspec 6622C019
Renovation, Infrastructure
Results

New Martinsville - Proctor Rd
Infrastructure
Design
$1,100,000 CJ est. value
New Martinsville, WV 26155

Resurfacing - Slim Chance - Mountaineer Hwy
Infrastructure
Bidding
$405,000 CJ est. value
New Martinsville, WV 26155

Deep Injection Roadway Settlement Stabilization
Infrastructure
Results

Structure Replacement
Demolition, New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Pine Grove, WV 26419

2022 RPM
Infrastructure
Results

Water System Extension and Rehabilitation - Contract No. 1 - Robinson Ridge Water Line Extension
Infrastructure
Results
$706,982 CJ est. value
Littleton, WV 26581

Last Updated 03/29/2023 07:35 AM
Project Title

Underwood Br

Physical Address View project details and contacts
City, State (County) New Martinsville, WV 26155   (Wetzel County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : STP0050411D Type of Work : REPL As of March 29, 2023, the project is in Final planning status. The funding obligation date for the construction is October 28, 2024. WVDOT - Underwood Br *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents