Similar Projects
South Bermuda - Parkway Reuse Interconnect and Judge Farms Finished Pipeline
Post-Bid
Kissimmee, FL

Southwest Water Treatment Plant 30-Inch Raw Water Line Replacement
Post-Bid
Kissimmee, FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Poinciana Service Area Utility Construction Neighborhood 2 West, Village 7
Results
$3,100,000 est. value
Kissimmee, FL 34741

Pavement, Sidewalk, Curb and Gutter Repair Services
Post-Bid
Kissimmee, FL

State Road 530 Utility Adjustment Project
Results
Less than $198,000 est. value
Kissimmee, FL 34741

Casa Bella Force Main Impact Repair
Infrastructure
Post-Bid
Kissimmee, FL 34746

Tropical Park Water Main Extension
Results
$1,603,974 est. value
Kissimmee, FL

Construction Services for Simpson Road Widening Phase I Project
Infrastructure
Post-Bid
$15,000,000 est. value
Kissimmee, FL 34746

CDBG Funded Sidewalk Construction Project for KOA Elementary School
Results
Kissimmee, FL 34758

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Toho-Valencia Trail II
Infrastructure
Results
$250,000 est. value
Kissimmee, FL

Construction of Fortune-Lakeshore Multi-Use Trail Project
Infrastructure
Results
Kissimmee, FL 34746

Parking Lot Striping and Minor Repairs Contractor Services
Term Contract, Infrastructure
Results
FL

Construction Services for the Bill Beck Boulevard Extension Project
Infrastructure
Results
$7,939,380 est. value
Kissimmee, FL 34744

Last Updated 04/15/2022 10:17 AM
Project Title

Lakeshore Trail Utilities Improvements and Adjustments

Physical Address View project details and contacts
City, State (County) Saint Cloud, FL 34769   (Osceola County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $770,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Multi-use trail that goes from Brown Chapel Road to Partin Settlement Road, along Lakeshore Boulevard. The installation of the multi-use trail and the associated wall will conflict with the City’s water and reuse water mains at several points along this run. The project will include relocation of existing utilities as well as upgrading lines and running new connections and new services to nearby areas

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents