Similar Projects
Sunmount DDSO, Reinsulation of Basements/Crawlspaces and Asbestos Abatement
Alteration
Bidding
$24,000 to $3,000,000 est. value
Tupper Lake, NY 12986

Light Interior Construction at (2) Fire Stations
Alteration
Bidding
Saratoga Springs, Wilton, NY 12831

Carpet and Tile Installation and Removal
Term Contract
Post-Bid
Buffalo, Orchard Park, Williamsville, NY 14203

Clarkstown CSD Time and Materials Project
Post-Bid
New City, NY 10956

Signage
Results
Shandaken, NY 12480

Gore Mountain Reservoir Siphon Upgrades
Results
$300,000 to $600,000 est. value
North Creek, NY 12853

Fabricate and Install Custom Stairs - North Pump Station
Alteration
Bidding
New City, NY 10956

Firehouse Ceiling
Term Contract
Post-Bid
Canastota, NY 13032

Stillwater CSD 2020-2021 Door and Locker Reconstruction at the Elementary School
Results
Less than $70,000 est. value
Stillwater, NY 12170

Suspended Ceiling Tile and Grid Replacement
Post-Bid
Williamsville, NY 14221

Replacement of Lighting for Five Offices and Three Storage Areas with More Efficient LED Lighting Fixtures
Results
Lowville, NY 13367

Interior Maintenance at Greenfield Park Fire Station
Post-Bid
Greenfield Park, NY

396 Waring Road Fire Restoration
Results
Rochester, NY 14611

Frontier CSD Capital Outlay Project - Pinehurst Elementary School
Post-Bid
Lake View, NY

New Optics Labs - Building 9
Results
Rochester, NY 14623

Last Updated 04/05/2022 03:37 PM
Project Title

Roosevelt High School Replacement of Ceiling and Lights - Phase II

Physical Address View project details and contacts
City, State (County) Yonkers, NY 10710   (Westchester County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the replacement of ceilings, lights and associated fire alarm system. A. Scope of demolition and removal work is indicated on drawings. 1. The project includes replacement of ceilings and related electrical work in corridors and the cafeteria as indicated. 2. The contractor will be allowed to start work when contracts are awarded. 3. The contractor is responsible to firestop all penetrations through walls. 4. The project does not involve asbestos abatement. 5. The interior corridor work will be done during the 2022 summer recess. 6. Exit lights – new fixtures to be provided. See drawing E001 for specification. 7. Speakers – new speakers to be provided. Speakers to be as indicated on the attached drawing E001. 8. Fire Alarm Devices – remove and reinstall in the ceiling. Johnson Controls does the maintenance of the system. Program the re-installed devices to operate in the system. 9. Cameras – remove and reinstall the new ceiling. Coordinate the work with ITG Larsen, the firm that maintains the security system for the District.

Details

Division 09 - Finishes, Ceilings.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents