Similar Projects
Rob Jaggers Main Water Line
Design
$200,000 to $400,000 est. value
NM

On-Call Construction Services for the Utilities Department
Term Contract
Bidding
Rio Rancho, NM

Santa Clara Pueblo Water and Wastewater System Improvements - Upper West Housing
Infrastructure
Bidding
Santa Clara, NM

Lift Station 1 Rehabilitation and New Force Main
Post-Bid
Rio Rancho, NM 87124

Construction of Water System Improvements - Phase II
Post-Bid
Red River, NM 87558

Advanced Metering Infrastructure
Results
Less than $963,817 est. value
Truth or Consequences, NM 87901

Chamberino Mutual Domestic Water Consumer and Sewer Association Water System Improvements Project
Results
Anthony, NM 88021

Priority Line Replacement
Infrastructure
Bidding
Santa Fe, NM

Water System Valve Replacement
Post-Bid
Roswell, NM 88201

2018 Colonias Water System Improvements
Results
$373,870 est. value
Lordsburg, NM 88045

Advanced Metering Infrastructure (AMI) System
Infrastructure
Bidding
Rio Rancho, NM

Construction of Navajo Gallup Water Supply Project Reach 27.10
Post-Bid
Gallup, NM 87305

Alto 2 Well (H-1979-S7) Improvements
Results
Ruidoso, NM 88345

La Cueva MDWCA Water System Improvements Project
Infrastructure
Bidding
Santa Fe, NM

Los Brazos Water System Improvements
Post-Bid
Less than $65,000 est. value
Tierra Amarilla, NM

Last Updated 06/11/2021 02:57 PM
Project Title

Adams Street to CR A99 Waterline Replacement

Physical Address View project details and contacts
City, State (County) Clayton, NM 88415   (Union County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall generally consist of: Install approximately 1,320 linear feet of new 4-inch water main between Adams Street and CR A99 parallel to the existing water main with connections to the existing water mains; replace service lines at specified locations between new water main and existing meter; and abandon existing water main in place once new water main is disinfected, pressure tested, and in operation.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents