Similar Projects
Lloyd Auman Elementary School HVAC Upgrade
Alteration
Bidding
Fayetteville, NC 28304

Warrenwood Elementary School HVAC Upgrade
Alteration
Bidding
Fayetteville, NC 28311

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

Anne Chesnutt Middle School and Morganton Road Elementary School, HVAC Infrastructure
Results
Fayetteville, NC 28303

Morganton Road Elementary School, Kitchen HVAC Addition and Building F HVAC Unit Replacement
Results
Fayetteville, NC 28303

Rockfish Elementary School HVAC and Window Replacement
Alteration
Bidding
Hope Mills, NC 28348

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

Benjamin Martin Elementary School and Ponderosa Elementary School Kitchen HVAC Additions
Results
Fayetteville, NC 28303

Gray's Creek Elementary School HVAC and Window Replacement
Alteration
Bidding
Hope Mills, NC 28348

Garage Air System Repair
Alteration
Post-Bid
Fayetteville, NC

South View High School Admin A/C Replacement
Results
Hope Mills, NC 28348

EE Smith Science Class Rooms AC Replacement
Alteration
Post-Bid
Fayetteville, NC 28301

C Wayne Collier Cafeteria A/C Replacement
Results
Fayetteville, NC 28305

College Lakes Package AC Replacements for Buildings 2,3 and 5
Alteration
Post-Bid
Fayetteville, NC 28311

Last Updated 01/20/2022 10:28 AM
Project Title

Ferguson Easley Cafe AC Replacement 2021

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28301   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor is to remove and dispose of existing air handlers and condensing units. Contractor is to install two new 7.5 ton heat pump condensers and two new 7.5 ton air handlers with heat strips. The new units will match existing units voltage and phase. The heat strips shall match existing units btu. The contractor will install new programmable thermostats. The contractor will connect the new units to existing duct. All duct joints and connections will be sealed with mastic. The contractor shall install a new line sets. The contractor shall install new power wiring and conduit from the disconnects to the unit. The contractor is responsible for all permits and inspections.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents