Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 4030 Carter Avenue Bridge
Demolition, New Construction, Infrastructure
Design
$2,041,940 CJ est. value
Indiana, PA 15701

SR 4030 Carter Avenue Bridge
Demolition, New Construction, Infrastructure
Design
$2,041,940 CJ est. value
Indiana, PA 15701

Marion Center Bridge #1
Demolition, New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Marion Center, PA 15759

Marion Center Bridge #1
Demolition, New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Marion Center, PA 15759

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Range Road Maintainence
Infrastructure
Results
$52,712 CJ est. value
Cherryhill Township, PA 15765

Range Road Maintainence
Infrastructure
Results
$52,712 CJ est. value
Cherryhill Township, PA 15765

Broadhead Run Bridge #2
Demolition, New Construction, Infrastructure
Conception
$2,145,300 CJ est. value
Canoe Township, PA 15771

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Fagley Run Bridge #2
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Shelocta, PA 15774

Work Order Construction Contracts
Term Contract
Post-Bid
Indiana, PA

Parking Lot Improvements Project
Infrastructure
Results
$300,000 est. value
Homer City, PA

Last Updated 01/05/2024 02:45 PM
Project Title

RVSD Athletic Facilities Phases 1, 2, and 3 Utility, Grading, Driveway, Walls, and Drainage Project

Physical Address View project details and contacts
City, State (County) Blairsville, PA 15717   (Indiana County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,352,335 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 5, 2024, the project has not been awarded. A timeline for award has not been confirmed. River Valley School District will be accepting bids for the Athletic Facilities Phases 1 and 2 Utility, Grading, Driveway, Walls, and Drainage Project. The project includes replacement of 8" existing Sanitary Main Sewer, new 8" Sanitary Main Sewer Alignment, 6" lateral reconnections, lateral wye and reconnections, sanitary manhole replacements, new sanitary manholes, with a doghouse and flat-top sanitary manhole. The storm culvert relocations will include two new inlet tie-ins to existing, as well as new 12", 18", 24", and 36" SLCPP, inlets, storm manholes, a subgrade detention system using Modular Units encased with AASHTO No. 57 drainage aggregate, control structures using PADOT Type 4 and Type 5 double inlets with weirs, and precast end wall structures with rip-rap outlet aprons. An aggregate haul road, stockpile area, three (3) Sediment Basins, and borrow area are to be completed and remain with restorations. Existing sidewalk and curb will be demolished for new Asphalt driveway pavements. A new Retaining Wall "1" will be constructed. The work includes major topsoil removal, grading, as well as erosion controls to remain in place. Pavements and surfaces include seed restorations, as well as a new parking lot and driveway full depth with transitional hot mix asphalt pavements, and a 8" layer of compacted crushed limestone aggregate subgrade layer under a drainage subbase. The Contractor shall be responsible for the proper disposal of excavated sewer, structures, culvert, endwalls/headwalls, pavement, and restorations including reseeding associated with this project. The contractor will submit a proposal cost for the option alternates for underground detention and infiltration required by the owner, as well as proposal pricing for any Allowances that will be negotiated in accordance with the specifications. Contractor to coordinate with the Engineer for actual field locations of all construction items. Bidders shall review the Information for Bidders, General Conditions, and Special Conditions. Bid Bond of 10% required. Performance and Payment Bonds 100% required on Award. Warranty Bond for 2 years in 100% of contract required. Clarification Deadline: 4/18/2023 11:13 AM

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents