Similar Projects
Scott Hall - 2022 HVAC Renovations
Alteration
Bidding
Decatur, MS

THS PAC Chiller
Post-Bid
Tupelo, MS 38804

HVAC Service Provider
Term Contract
Post-Bid
Ellisville, MS 39437

HVAC Maintenance at City of Brookhaven Owned Facilities
Results
Brookhaven, MS

Renovation of 37,000 SF Industrial Building - Contract No. 2 - HVAC Unit Replacement
Results
Tylertown, MS

Chiller Replacement
Term Contract
Post-Bid
Ellisville, MS

Bureau of Building 321-268 Housing Units HVAC Mississippi State Penitentiary
Results
Tutwiler, MS 38963

2021 HVAC Controls Upgrade
Post-Bid
Oxford, MS 38655

Long Beach Library - HVAC System Repairs
Results
$165,100 est. value
Long Beach, MS

4120--Air Handler 3F AHU Coil Replacement
Post-Bid
Jackson, MS 39216

Office HVAC Upgrades
Results
Madison, MS

Air Filters and Services
Post-Bid
Oxford, MS

New Vent Hood At Neshoba Central High School
Results
Philadelphia, MS

Clinton Public School District ESSER HVAC Renovations
Post-Bid
Clinton, MS

HVAC Filter and Filter Changing Services
Alteration
Results
De Soto, MS

Last Updated 08/30/2022 08:04 AM
Project Title

Marshall County School District ESSER II HVAC Renovations

Physical Address View project details and contacts
City, State (County) Holly Springs, MS 38635   (Marshall County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Marshall County School District - ESSER II HVAC Renovations This project will use funds from the Elementary and Secondary School Emergency Relief (ESSER) Fund. Bidders may submit a sealed bid as indicated above or may submit an electronic bid in lieu of a sealed bid. Electronic bids are not required but are an option. Proposals shall be submitted with Proposal Security in the form of Certified Check or acceptable Bid Bond in an amount equal to at least five percent (5%) of the base bid; such security is to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out the terms of the proposal. The Bid Bond, if used, shall be payable to the Owner. Bonds on the project must be received on or before the period scheduled for the project and no bid may be withdrawn after the scheduled closing time for the project. Bids must be firm for a period of forty-five (45) days after the scheduled time of opening. A one hundred percent (100%) Performance-Payment Bond issued by a surety company authorized to do business in the State of Mississippi will be required within ten (10) days after the successful bidder has been notified of the award of the contract to him. All bids submitted by a prime or subcontractor for public works or public projects where said bid is in excess of fifty thousand dollars ($50,000.00) to perform contracts enumerated in Section 31-3-21, Mississippi Code of 1972, shall contain on the outside or exterior of the envelope or container of such bid the contractor's current certificate number. No bid shall be opened or considered unless such contractor's current certificate number appears on the outside or exterior of said envelope or container or unless there appears a statement on the outside or exterior of such envelope or container to the effect that the bid enclosed therewith does not exceed fifty thousand dollars ($50,000.00). NOTE: When bids are submitted electronically, the requirement for including on the exterior of the bid envelope the contractor's current certificate of responsibility number or a statement that the bid enclosed does not exceed fifty thousand dollars ($50,000.00) shall be deemed fulfilled and the bid in compliance by including the same information as an attachment with the electronic bid submittal. The Owner reserves the right to reject any or all bids and to waive irregularities.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents