Similar Projects
Fire Line Backflow Services
Term Contract
Bidding
FL

Fairways of Capri Isles Water Main Improvements
Bidding
$600,000 est. value
Venice, FL

Advanced Metering Infrastructure (AMI)
Post-Bid
Sarasota, FL 34230

Unit Price Contract for Small Pipeline
Term Contract
Post-Bid
Less than $5,000,000 est. value
Sarasota, FL 34230

Regional Integrated Loop System Phase 3B Interconnect (Preymore to SR 72)
Results
$12,092,815 est. value
FL

Valve Replacement Program – Phase 13
Results
Less than $125,000 est. value
Venice, FL 34285

Nokomis Sewer Phase II
Post-Bid
FL

Hillview Forcemain Extension and Midnight Pass Watermain Replacement
Results
$375,146 est. value
Sarasota, FL 34230

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Bayfront Park AC Water Main Replacement Siesta Drive AC Water Main Replacement 7
Results
Sarasota, FL 34236

Turtle Rock-McIntosh Reclaimed Water Main
Results
$503,593 est. value
Sarasota, FL 34230

Myakkahatchee Creek Water Treatment Plant to Ortiz Water Main
Results
North Port, FL

South Biscayne Drive and Pan American Boulevard Bridge Pipeline Replacements
Results
$538,357 est. value
North Port, FL 34287

Peace River Water Main Interconnect
Results
$17,786,340 est. value
Sarasota, FL 34230

San Mateo Potable Water Main
Results
North Port, FL 34286

Last Updated 03/24/2021 07:06 AM
Project Title

West Venice Avenue Water Main Improvements

Physical Address View project details and contacts
City, State (County) Venice, FL 34285   (Sarasota County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Two (2) new 6-inch PVC water main, each approximately 2,500 LF, on Venice Avenue, between The Esplanade and Ave De Parques (~5,000 LF of new water main), and installation includes applicable isolation valves and fire hydrant assemblies. Installation of approximately 500 LF of new 8-inch PVC water main on The Esplanade, between Granada Avenue and Venice Avenue. Connections from the new mains to existing service lines serving existing meters and fire protection systems or fire hydrant lines. Abandonment of approximately 2,500 LF of existing 6-inch water main along Venice Avenue and approximately 500 LF of existing 8-inch water main along The Esplanade. Root pruning of existing trees along Venice Avenue shall be performed as shown on the drawings with restoration. No new customers are being served by this project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents