Similar Projects
2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Center Street Corridor Streetscaping
Infrastructure
Bidding
$300,000 est. value
Cedar Falls, Cedar Rapids, IA 52401

10th Avenue Sidepaths
Infrastructure
Post-Bid
IA

Cedar Valley Nature Trail Rehabilitation
Infrastructure
Post-Bid
$180,000 est. value
Ely, IA

6th Street SE from 4th Avenue to 6th Avenue
Results
$950,000 est. value
Cedar Rapids, IA 52401

8th Avenue South West from 15th Street South West to Rockford Road
Results
$3,220,000 est. value
Cedar Rapids, IA 52407

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

Grant Wood AEA Phase II Pavement Rehabilitation
Infrastructure
Post-Bid
Cedar Rapids, IA

Bowling Street SW Sidewalk Infill
Results
$990,000 est. value
Cedar Rapids, IA 52404

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

2022 Institutional Roadway Improvements Project
Infrastructure
Post-Bid
$400,000 est. value
Cedar Rapids, IA 52404

2021 Curb and Gutter Rehabilitation
Infrastructure
Results
Less than $890,000 est. value
Cedar Rapids, IA 52405

Lindale Trail Phase II from I-380 to Council Street North East
Conception
$1,200,000 est. value
Cedar Rapids, IA

Lisbon Sports Complex Phase 1
Infrastructure
Post-Bid
Lisbon, IA 52253

Reported 05/26/2022 12:00 AM
Project Title

Fitzroy Road Extension Project

Physical Address View project details and contacts
City, State (County) Hiawatha, IA   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $254,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Fitzroy Rd Extension - 202204 involves a concrete roadway extension of Fitzroy from Forrest Meadow Lane east to the new Turtle Creek Park entrance. In addition, a new concrete driveway will be installed from the new roadway up to the Hiawatha Well House building. An existing rock base was installed in the fall of 2020 and will require trimming and filling in low areas to meet the proposed subbase grades. Topsoil will be placed behind the new roadway and seeded. Excess rock will be used as shoulder for the concrete driveway. There will be minimal storm sewer placement on this project. Project location: Fitzroy Road Hiawatha Iowa 52411

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents