Similar Projects
Furnish and Install A Dock at Pack's Landing
Bidding
Rimini, SC

Wooden Seawall - Dewits Bluff Landing
Bidding
Pamplico, SC 29583

Replacement of the Folly Beach Fishing Pier
Post-Bid
Folly Beach, SC 29439

Labor to Replace Decking at Abernathy Waterfront Park
Post-Bid
Clemson, SC 29631

Enterprise Boat Landing Parking Area Repair and Resurfacing Project
Results
Less than $205,379 est. value
Conway, SC 29588

Fishing Dock Replacement at James Island County Park
Results
Charleston, SC 29412

The Waterfront
New Construction
Construction
Daniel Island, SC

Construction of The Mount Pleasant Memorial Waterfront First Responders Monument
Bidding
Mount Pleasant, SC 29464

Building ADA Compliant Ramp
Post-Bid
Less than $20,000 est. value
Rembert, SC

Constitution Park Bulkhead Repairs Project
Results
Georgetown, SC 29440

Citadel Marina Maintenance - 2020 Phase I CDF Drying Project
Post-Bid
$80,000 to $100,000 est. value
Charleston, SC 29409

Fort Johnson Boat Slip Repairs
Results
$589,344 to $648,279 est. value
Charleston, SC 29422

Cooper River Marina Dock Repairs
Post-Bid
Charleston, SC 29403

South Island Ferry Boat Landing Dock Replacements and Additions
Results
Less than $372,720 est. value
Georgetown, SC 29440

Battery Pringle Revetment Renovation Project. The Dill Property
Renovation
Post-Bid
James Island, SC

Reported 03/10/2021 12:00 AM
Project Title

Underwater Piling Installation

Physical Address View project details and contacts
City, State (County) Eastover, SC   (Richland County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: 8(a) Set-Aside (FAR 19.8) The South Carolina Air National Guard anticipates the solicitation and award of a contract to install fourteen (14) pilings at Building 256 on McEntire Joint National Guard Base, Eastover, SC. The project scope includes but is not limited to installing fourteen (14) 8” diameter pilings for a 20’ x 5’ walkway and a 20’ x 20’ dock. Pilings shall be driven a minimum of 5’ into the ground in water that could potentially reach up to 12’ deep. Contractor must have adequate knowledge in performing work related to underwater piling installation.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents