Similar Projects
Last Updated | 08/05/2021 01:40 PM |
Project Title | CEP - Refurbishment of Two (2) Cooling Towers |
Physical Address | View project details and contacts |
City, State (County) | West Palm Beach, FL 33401 (Palm Beach County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | a. Complete turnkey overhaul and mechanical rebuild of two (2) of the four (4) Ceramic Cooling Towers model PL-450-20BS (known as cooling towers 1 and 4). b. Remove old mechanical equipment and drift eliminators. c. Pressure wash and clean tower and existing ceramic fill to remain. d. Seal all joints. e. Repair broken spray headers and supports. f. Install new mechanical supports. g. Install new gear reducer, motor and fan with proper alignment and balance. h. Replace vibration, low oil, emergency stop, and any other safety devices/switches located on or within the towers. i. Install new drift eliminators. j. Replace stainless steel access doors/ frames on both towers. k. Replace stainless steel disconnect and conduit supports where needed at each tower. l. Provide and install new externally mounted oil level sight-glasses. m. Systems shall be started after installation is complete, and tested for proper operation with Capital Improvement Project Manager present. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |