Similar Projects
Deep Well Rehabilitation - Well #16 - PWWS013.0-16 - Village of Mount Prospect
Renovation, Infrastructure
Conception
$535,000 CJ est. value
Mount Prospect, IL 60056

Rolling Meadows Courthouse - Hot Water Storage Tanks for HVAC System - Cook County
Infrastructure
Conception
$300,000 CJ est. value
Rolling Meadows, IL 60008

1,000,000 Gallon Composite - Evergreen Avenue
Renovation
Bidding
$150,000 CJ est. value
Hanover Park, IL 60133

Potable Water Reservoir
Infrastructure
Post-Bid
Broadview, IL 60155

Rodenburg Maint CIF AST Storage Tank
Infrastructure
Post-Bid
Schaumburg, IL

Maple Street Reservoir Fill Improvements
Infrastructure
Results
Des Plaines, IL

New Elevated Water Storage Tank (Oakton and Busse)
Infrastructure
Results
$5,286,862 est. value
Elk Grove Village, IL

Water Reservoir Number 4 Rehabilitation - Village of Mount Prospect
Infrastructure
Conception
$685,000 CJ est. value
Mount Prospect, IL 60056

Hot Water Storage Tank
Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Chicago, IL 60612

Four Flaggs Tank Rehab, Painting and Tower Facilities Lightning Protection and Oriole Tower Lightning Protection
Infrastructure, Alteration
Results
Niles, IL 60714

Elevated Tank Riser Pipe Replacement
Renovation
Post-Bid
$400,000 CJ est. value
Calumet City, IL 60409

Elevated Water Tanks 6 and 4 Rehabilitation
Infrastructure
Results
Orland Park, IL 60462

13 North Tank and 16 East Tank
Infrastructure
Results
Arlington Heights, IL 60004

1.0 MG Elevated Water Storage Tank
New Construction
Results
$4,343,400 to $5,298,000 est. value
Lemont, IL 60439

Dewatering and Cleaning - 2 Million Gallon Semi-Submerged Concrete Lined Water Reservoir
Infrastructure
Results
Schaumburg, IL

Last Updated 02/09/2023 06:37 PM
Project Title

Elevated Tank Re-coating and Repair Program - WCI-02 - Village of Wheeling

Physical Address View project details and contacts
City, State (County) Wheeling, IL 60090   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the re-coating of the elevated water tanks and standpipes throughout the Village . Also, some of the facilities may need repairs and modifications to ventilation systems to become compliant with current federal and state standards. The program operates in two phases: the first includes a thorough and complete independent inspection of the applicable facility and the preparation of contract documents (to be completed in the year prior to anticipated coating schedule) and the second incorporates the actual labor of re-coating the structure. 2023 - Standpipe (SRC) 95 Willow Rd 2026 - Elevated Tank 6 - 560 Fairway Drive 2029 - Elevated Tank (Well #1)-355 Center Street 2030 - Elevated Tank 3 (Well #5)- 175 Old McHenry Road 2031 - Standpipe 2 (CRS) - 750 South Wheeling Road 2032 - Standpipe 1 (NRS) - 630 Northgate Parkway This project is included in the City of Wheeling's FY 2023-2027 CIP. As of February 9, 2023, information regarding a design team or a general contractor is not available. Construction is anticipated in 2023 and 2026.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents