Similar Projects
Alabama Cruise Terminal SPBB Gangway Improvements
Infrastructure
Design
Mobile, AL 36602

Dredging of Mobile Harbor, Mobile County, Alabama
Infrastructure
Design
$25,000,000 CJ est. value
Mobile, AL 36602

2018 PAYGO- North McGregor Avenue Reconstruction
Infrastructure
Bidding
$5,533,257 CJ est. value
Mobile, AL 36608

Oil Water Separator Replacement Municipal Garage
Infrastructure
Bidding
$200,000 CJ est. value
Mobile, AL 36602

Michael Figures Park - Combo Athletic Field Lighting
Renovation, Infrastructure
Sub-Bidding
$400,000 CJ est. value
Mobile, AL 36617

Desoto Boat Ramp Go Mesa Project G-DIHMA/19/DI
Post-Bid
Dauphin Island, AL 36528

Semmes Municipal Complex
New Construction
Post-Bid
Semmes, AL

Improvements and Repairs to Marine Resources Boat Slips 1 and 2
Results
$1,653,000 est. value
Dauphin Island, AL

Little Billy Goat Hole Marine Improvements
Infrastructure
Results
$530,661 est. value
Dauphin Island, AL 36528

Murphy Oil #6987/7817 / Semmes
Demolition, New Construction, Infrastructure - 1,400 SF
Construction
$2,000,000 CJ est. value
Semmes, AL 36575

Austal USA Auxiliary Floating Dry Dock / Mobile
Infrastructure
Pending Verification
$128,100,000 CJ est. value
Mobile, AL 36602

Austal USA Auxiliary Floating Dry Dock / Mobile
Infrastructure
Pending Verification
$128,100,000 CJ est. value
Mobile, AL 36602

Cruise Terminal Seaport Boarding Bridge
Infrastructure
Bidding
$600,000 CJ est. value
Mobile, AL 36602

BFM RW 14 Culvert Extension and Tree Clearing
Infrastructure
Post-Bid
Mobile, AL 36615

Micro-Milling, Resurfacing, and Traffic Stripe on I-10
Infrastructure
Results
$9,169,472 CJ est. value
Mobile, AL 36605

Last Updated 08/03/2022 06:03 PM
Project Title

Berth 2 Fender Refurbishment

Physical Address View project details and contacts
City, State (County) Mobile, AL 36602   (Mobile County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022,
Bids Due View project details and contacts
Estimated Value $88,585 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

***As of August 3, 2022. Project has been awarded to Baggett Robert J Inc for $88,584,90 The work consists principally of providing bonds, labor, materials, equipment, insurance, and supervision necessary for the removal of deteriorated sections of fender system, purchase and installation of new fender system and disposal of all removed materials associated with the work. The project includes, but is not limited to, the purchase and installation of rubber cell fender units, timber and steel fender components, chain assemblies, bolts and all associated hardware. All materials, labor, tools, rigging and equipment necessary to perform the work shall be included by the Contractor in the proposal. It is the Contractor's responsibility to field verify all dimensions and site conditions essential for the successful completion of the work. The Contractor shall not be entitled to any additional compensation for any work or expense resulting from the neglect of verifying all existing site conditions Any questions regarding the procurement should be directed to Matthew Thomas, E.I., Project Manager, at phone number (251) 441-7242 or email matthew.thomas@alports.com A Bid Bond or Certified Check made payable to the Alabama State Port Authority and equal to five percent (5%) of the amount bid, not to exceed $10,000, must accompany the Bid Proposal. Performance Bond and Labor & Material Bonds shall be in an amount equal to 100% of the contract price; Certificate of Insurance shall be as per the attached requirements and countersigned by a licensed resident agent in the State of Alabama. The Contractor will be required to complete the work under the Contract within 150 calendar days after receipt of a "Notice to Proceed". Work will start and the Contractor will be required to furnish proof of purchase of materials within 10 calendar days after receipt of notice to proceed. The work will have to be scheduled and performed in a manner that will not interfere with the operations of the facility ongoing in the immediate and adjacent areas. ASPA intent is that work hours will be during normal day light hours. The Authority reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the Authority that such bidder is properly qualified to carry out the obligations of the Contract. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents