Similar Projects
Last Updated | 03/10/2022 10:37 AM |
Project Title | Boiler Re-Tubing |
Physical Address | View project details and contacts |
City, State (County) | Philadelphia, PA (Philadelphia County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | All Submissions Received, Selection Underway |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Boiler Re-tubing on Kewanee Mo.sp2000-g0 remove and Dispose of All One Hundred Sixty-four (164) 2" Fire Tubes From Boiler, Per Boiler qty 70-2" X 154" Tubes qty:94-2" X 131" Tubes supply and Install One Hundred Sixty- Four (164) New 2" Firetubes of Sa178-a Steel Per Boiler. new Tubes Are A214 Carbon Steel Tube With 0.105" Wall Thickness the New Tubes Will Be Expanded and Flared at the Tube Ends, Except in the Rear Tubesheet Hot Pass Where They Will Be Expanded and Seal Welded and Re- Expanded fill the Boiler and Test at Operating Pressure to Demonstrate the Tightness of All New Work supply Inspection by Authorized Inspector to Witness the Pressure Tests and Provide Signed R-1 Record of Weld Repair Form fire and Tune the Burner to Optimum Efficiency clean Jon Site and Leave the Work Area Broom Clean 1 Each Is 1 Boiler see Attached Insurance Requirements or Septa Approved Equal an Award, if Any, Will Be to the Lowest Responsive, Responsible Bidder Excluding Any Cash Discount Offered. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |