Similar Projects
RFP D/B - Design/Build Services for HVAC Automation Control Upgrades
Renovation
Bidding
$3,685,500 CJ est. value
Stone Mountain, GA 30083

Phase 2 of Chiller Replacement
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Athens, GA 30605

Nicholson Elementary School HVAC Improvements
Renovation
Sub-Bidding
$300,000 CJ est. value
Marietta, GA 30066

On-Call HVAC Maintenance and Repair Services
Alteration
Post-Bid
Savannah, GA

TAB Services for Facility HVAC System
Alteration
Post-Bid
Augusta, GA

Multiple HVAC Replacements at Multiple County Locations
Alteration
Results
$377,606 est. value
Canton, GA 30114

Upgrade to Siemens Desigo CC BAS Systems
Term Contract
Results
Athens, GA 30605

Russell Elementary School HVAC Improvements
Renovation
Sub-Bidding
$300,000 CJ est. value
Marietta, GA 30060

City Wide HVAC Maintenance and Repairs
Alteration
Post-Bid
Savannah, GA

Energy Efficiency and Infrastructure Upgrades
Renovation
Results
$2,848,860 est. value
Atlanta, GA 30310

RFP General Contractor - HVAC and Controls Replacements
Renovation
Sub-Bidding
$460,000 CJ est. value
Decatur, GA 30030

Fort Stewart Range Hood
Term Contract
Post-Bid
Fort Stewart, Savannah, GA 31409

Bi-Polar Ionization System Replacement Project
Alteration
Results
Atlanta, Milton, GA 30350

Kitchen Exhaust Cleaning Services
Term Contract
Post-Bid
Atlanta, GA

Sonoraville High School HVAC Modification
Alteration
Results
$325,000 est. value
Calhoun, GA 30701

Last Updated 07/19/2023 12:38 PM
Project Title

Computer Technology And Mathematics Classroom Building (CTM) And Gayles-felton Academic Classroom & Lab Building (ACL) Boiler Replacements

Physical Address View project details and contacts
City, State (County) Fort Valley, GA 31030   (Peach County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $421,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A. Scope of demolition and removal work is shown on drawings. B. Scope of alterations work is indicated on drawings. C. The purpose of the project is to replace the existing cast iron boilers in the ACL and CTM buildings with new condensing boilers. D. The new boiler for the CTM building will be furnished by the FVSU and installed by the Contractor. E. In both buildings, existing heating water pumps and corresponding starters will be replaced with new pumps and variable frequency drives. F. In both buildings, upgrade existing BMS to support heating water system upgrades and new sequence of operations. G. Perform electrical work in support of demolition of existing HVAC and installation of new HVAC systems. H. Protect existing floors, finishes and building during the HVAC upgrades. I. Make other improvements as noted on the Drawings.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents