Similar Projects
Upgrade HVAC Compressed Air
Post-Bid
Less than $1,000,000 est. value
Boulder, CO

Domestic Water and Heating Pipe Insulation
Post-Bid
Boulder, CO 80303

AHU Project at Denver Air Route Traffic Control Center for HVAC Contractor
Results
$200,000 to $300,000 est. value
Longmont, CO

Fairgrounds Exhibit Building Chiller Replacement
Results
Longmont, CO 80501

Air Conditioning - Design Build
Post-Bid
Boulder, Louisville, CO

Saint Vrain HUB - AHU Replacement
Results
Longmont, CO 80501

Sources Sought - Cryogenic Dilution Refrigerator System
Post-Bid
Boulder, CO

Replace Windows, Stairs and HVAC at Longmont Readiness Center
Results
Less than $350,000 est. value
Longmont, CO 80501

Nist Boulder Building 42 Cooling Tower Capacity Upgrade
Post-Bid
$1,000,000 to $5,000,000 est. value
Boulder, CO 80305

Chiller Replacement
Results
Longmont, CO 80503

Purchase and Delivery of Roof Top Unit (RTU) - Lyons High School
Post-Bid
Lyons, CO 80540

Courthouse Third Floor Remodel Mechanical HVAC and Plumbing
Results
Boulder, CO 80302

CP291773 - Camp - CHW Plant Enhancement Project
Post-Bid
Less than $5,000,000 est. value
Boulder, CO 80303

NIST Building 42 Central Utility Plant - Cooling Tower Upgrade
Post-Bid
$1,000,000 to $5,000,000 est. value
Boulder, CO 80305

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Last Updated 05/19/2020 10:43 AM
Project Title

Notice 20-01-Rfp-Umc-Bldg-Recommissioning

Physical Address View project details and contacts
City, State (County) Boulder, CO   (Boulder County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The process to be used in the selection of the General Contractor is comprised of two steps. STEP I is the Submittal of Prequalification and STEP II is submission of the bid. Sealed bids will be accepted only from those firms who are selected as pre-qualified by the University of Colorado Boulder for this project. This project involves the conversion of various HVAC systems in the University Memorial Center (UMC) to direct digital control. Scope includes but is not limited to removal and replacement of various pneumatic controls, associated valves, actuators, VAV boxes and sensors. All DDC controls will be Andover to match existing systems.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents