Similar Projects
Water Main Replacement
Bidding
Elmwood Park, IL

Storm Sewer Improvements
Bidding
$1,000,000 to $5,000,000 est. value
Flossmoor, IL 60422

Term Agreement for Water Main Construction - District Two
Term Contract
Post-Bid
Chicago, IL

Drainage Engineering Services
Term Contract
Post-Bid
IL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Valve Actuator Replacement
Bidding
Oak Park, IL

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

Frontage Road Water Main Lining Improvements
Renovation
Results
Northfield, IL 60093

Water Supply Leak Detection Survey
Post-Bid
Park Ridge, IL 60068

Term Agreement for Water Main Construction - District Three
Term Contract
Results
Chicago, IL

Chestnut Avenue Improvements
Post-Bid
Glenview, IL 60026

Term Agreement for Water Main Construction - District One
Term Contract
Results
Chicago, IL

Basement Water Main Pipe
Renovation
Post-Bid
Park Forest, IL 60466

Water Main Construction - District 4 (Project 20-604)
Term Contract
Results
Chicago, IL

Last Updated 06/07/2021 12:04 PM
Project Title

Sewer and Water Main Replacement - Oak Street North 5th to North 8th Street

Physical Address View project details and contacts
City, State (County) Quincy, IL 62301   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,900,984
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1,406 FT (0.24 miles); Consists of approximately 1700 feet of water main replacement, 1360 feet of sanitary sewer replacement, 260 feet of storm sewers, 8 manholes, 10 inlets, 10,130 sq ft of PCC sidewalk, 1,685 sq yds of PCC pavement, 286 sq yds of PCC driveway pavement, 540 ft of curb & gutter, patching, seeding, and related improvements. Total length of the project is 0.27 miles.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents