Similar Projects
Last Updated | 04/05/2022 11:48 AM |
Project Title | Roof Replacement - Burbank Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Hampton, VA 23666 (Hampton City County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work of Project is defined by the Contract Documents and consists of the following : The project scope is generally comprised of the roof replacement of approximately 35,391 +/- square feet, including new gutters, downspouts, and trim metal. The roof replacement Work includes the removal of the existing roof systems along with the corresponding flashings and existing insulations as outlined in detail below. The Work includes the installation of a new single ply PVC/KEE membrane roof system, corresponding flashing, roof insulation and drainage accessories. B. All necessary precautions shall be taken during construction to protect the existing roof systems on adjacent roof areas which shall remain. No material or debris shall be stored or transferred over any of the roof areas not included in the project. Maintain the building in watertight condition throughout this Contract. Do not permit water to build up on the roof. Provide power hook-ups and pumps on the roof to remove rain that occurs before slopes to drains are achieved. Interior of building to be kept free of water entry of ANY amount throughout the entire roof replacement process. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |