Similar Projects
Osmond Building Renovations and New Physics Building (Eberly College of Science)
New Construction, Renovation - 152,000 SF
Design
Less than $148,800,000 est. value
University Park, PA

New Liberal Arts Research & Teaching Building Project - Design Assist
New Construction - 134,800 SF
Bidding
$40,250,000 to $49,000,000 est. value
State College, PA 16801

Henning Building Replacement
New Construction - 104,000 SF
Post-Bid
$89,600,000 est. value
State College, University Park, PA 16803

James Building Replacement
New Construction, Demolition - 85,000 SF
Post-Bid
State College, PA 16801

Walker Building Elevator Modernization (DGS)
Results
University Park, PA

Reber Building Instructional Suite
Renovation
Results
University Park, PA 16802

Deike Basement Renovation Phase 2 Geoscience Lab
Construction
University Park, PA 16802

College of Engineering, Research and Teaching Space I Building (West 1)
New Construction - 284,000 SF
Construction
Less than $167,000,000 est. value
State College, PA 16802

James Building Replacement-Millwork
New Construction, Demolition - 85,000 SF
Post-Bid
State College, PA 16801

PSU Loading Dock Relocation & Building Renovations
Renovation
Results
University Park, PA 16802

College of Engineering Research and Teaching Space II Building (West 2)
New Construction - 105,000 SF
Construction
Less than $63,000,000 est. value
University Park, PA

James Building Replacement-Electrical
New Construction, Demolition - 85,000 SF
Post-Bid
University Park, PA 16801

PSU Rooms 218-222 ESE Lab Renovations
Renovation
Construction
$475,000 to $575,000 est. value
University Park, PA 16803

James Building Replacement-Specialties
Post-Bid
University Park, PA 16801

Classroom Building Lab Renovations
Renovation
Construction
University Park, PA

Reported 12/03/2020 11:07 AM
Project Title

Willard Renovation Project

Physical Address View project details and contacts
City, State (County) University Park, PA   (Centre County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced fourth quarter 2019, Construction Completion Expected first quarter 2021
Bids Due View project details and contacts
Estimated Value $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of replacing existing mechanical, electrical, and life safety systems within Willard (approximately 58,000 sf) as well as a 3-story addition (approximately 5,000 sf) and renovations & upgrades to the interior spaces, window replacement, masonry restoration and re-caulking, and site improvements. Bid Packages: 16 Broadcast Equipment 5 Electrical 11 Glazing 12 Sitework 13 Roofing/Waterproofing 14 Masonry 8 Interiors 10 Elevator 15 Fire Protection 6 Flooring 7 Millwork 9 Painting 2 Structural Demolition 3 Building Concrete 4 Steel 1 Asbestos Abatement & Selective Demolition 1 Mechanical-Plumbing Design Assist Partner 2 Electrical Design Assist Partner 3 Audio Visual (AV Equipment)

Details

63,000 SF - 1 College/University, 58,000 SF Renovation, College/University, 3 Stories Above Grade, 5,000 SF Addition.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents