Similar Projects
Highway Sweeping Services
Infrastructure
Post-Bid

Highway Sweeping Services
Infrastructure
Post-Bid

IDIQ Maintain Pavements-Painting And Rubber Removal & Paint Striping
Term Contract
Results
Enid, OK 73705

Snow and Ice Plowing and Removal Services
Infrastructure
Results
$400,000 est. value
Oklahoma City, OK

Residential Street Resurfacing
Infrastructure
Post-Bid
$6,000,000 est. value
Oklahoma City, OK

Non-Arterial Street Maintenance Zone 6140
Infrastructure
Results
$3,235,753 est. value
Tulsa, OK

Bridge and Highway Maintenance and Hauling
Infrastructure
Post-Bid
Walters, OK

Bridge Painting - SH-36
Infrastructure
Results
$192,942 est. value
Devol, OK 73531

Reported 06/21/2022 10:04 AM
Project Title

Bike Lanes: On South East 59th Street from South Santa Fe Avenue to South Air Depot Avenue - City of Oklahoma City

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73150   (Oklahoma County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Tier 1 bike facilities project for the Better Streets Safer Sales Tax Program. Estimated annual operating cost is $0. As of June 20, 2022, this project is currently in the FY 2023 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 10 - Specialties, Signage, Traffic Signage.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation, Roadway Signaling and Control Equipment, Transportation Construction and Equipment, Roadway Construction, Vehicle Barriers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents