Similar Projects
Regional Maintenance of Grease Trap Services for Hampton Roads Virginia AOR
Term Contract
Design

Regional Maintenance of Grease Trap Services for Hampton Roads Virginia AOR
Term Contract
Design

Drain Line Replacement - VIP
Infrastructure
Bidding
$400,000 est. value
Norfolk, VA 23508

Drain Line Replacement - VIP
Infrastructure
Bidding
$400,000 est. value
Norfolk, VA 23508

Gate Valve and Reducing Nipple
Post-Bid
Norfolk, VA

Turnkey Stormwater Pipe Cleaning and CCTV Inspection and/or Stormwater Management Facilities (SWMF) Maintenance Services
Post-Bid
Virginia Beach, VA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Plumbing Maintenance and Repair Services
Term Contract, Alteration
Design
Less than $800,000 est. value
Portsmouth, VA 23709

Potable Water System Mitigation
Infrastructure
Bidding
$150,000 est. value
Blacksburg, VA

Perform Advanced Metering Infrastructure (AMI) Install of Water Meter
Infrastructure
Post-Bid
Portsmouth, VA 23703

Stormwater BMP Management IDQ FY21
Results
Less than $4,967,055 est. value
Norfolk, VA 23510

South Plaza Trail and Presidential Boulevard Drainage Improvements
Infrastructure
Bidding
$300,000 est. value
Virginia Beach, VA

Washington Street Infrastructure Improvements
Infrastructure
Post-Bid
Portsmouth, VA 23704

Wards Corner Service Area 150 Gravity Sewer and Water Main Replacement - Phase 6
Results
Less than $5,274,581 est. value
Norfolk, VA

Reported 05/06/2022 12:00 AM
Project Title

Christiansburg High School Bus Loop and Utility Relocation

Physical Address View project details and contacts
City, State (County) Christiansburg, VA 24073   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide a bus loop and utility relocation for Montgomery County Public Schools (MCPS). While these projects are presented as two separate site plans, the work is to be conducted congruently. The work under this project consists of the construction of a new bus loop and parking area at the South side of the Christiansburg High School along Independence Boulevard including associated storm drainage systems and an underground ADS StormTech detention system, as well as the construction of approximately 1500 linear feet of ductile iron waterline, approximately 1650 linear feet of PVC gravity sewer, and associated appurtenances such as valves and fire hydrant assemblies.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents