Similar Projects
Burns Harbor Marquette Trail Phase 2
Infrastructure
Bidding
$80,000 est. value
Burns Harbor, IN

Reconstruction of Lindberg Drive
Infrastructure
Bidding
$145,000 est. value
Warsaw, IN 46580

2020-2 City of Greensburg Community Crossing Matching Grant
Post-Bid
Greensburg, IN

Morrison TIF Sidewalk Improvements Phase II
Post-Bid
Muncie, IN

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

Parking Lot at Washington Park
Results
Bluffton, IN

County Road 200 North Roadway Improvements
Infrastructure
Bidding
$500,000 est. value
Huntington, IN

Hamilton Southeastern HS South Parking Lot Reconstruction
Post-Bid
Fishers, IN 46037

Bike and Pedestrian Facilities
Results
South Bend, IN

Pedestrian Path Construction on East 106th
Infrastructure
Bidding
$450,000 est. value
Carmel, IN 46032

Miscellaneous Repair to Curb, Curb and Gutter, Handicap Ramps and other Concrete Flatwork
Post-Bid
Terre Haute, IN 47803

Bike and Pedestrian Facilities
Results
IN

2022 City-Wide Roadway Lighting Project
Infrastructure
Bidding
$200,000 est. value
Logansport, IN

Mulberry Street Sidewalk and Curb Replacement
Post-Bid
Kokomo, IN 46902

Jasper Tenth Street ES Demolition and Parking Lot Construction and Site Improvements
Results
Jasper, IN 47546

Last Updated 06/01/2022 12:58 PM
Project Title

Pennsy Trail

Physical Address View project details and contacts
City, State (County) IN   (Hancock County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction and completion of the project in every detail of the work described, except for HMA-pavement-related work on Pennsy Trail which shall be completed by the Owner. HMA-pavement-related items to be paid by Owner are indicated on the Itemized Proposal and will be built according to Plans and Specifications by the Owner.Description: Pennsy Trail Construction (excluding HMA pavement) Location: From Existing Trail at CR 600 West to CR 500 West, Hancock County, Indiana

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents