Similar Projects
Campground Development - 459-054 - City of Sioux City
Infrastructure
Conception
$2,550,000 CJ est. value
Sioux City, IA 51101

Leeds Connector - 459-320 - City of Sioux City
Infrastructure
Conception
$250,000 CJ est. value
Sioux City, IA 51101

18th Street Viaduct - 719-071 - City of Sioux City
New Construction, Infrastructure
Design
$800,000 CJ est. value
Sioux City, IA 51105

18th Street Viaduct - 719-071 - City of Sioux City
New Construction, Infrastructure
Design
$800,000 CJ est. value
Sioux City, IA 51105

Construction of the Hamilton Boulevard Resurfacing Project 36th Street to City Limits Street
Infrastructure
Bidding
$1,235,000 CJ est. value
Sioux City, IA 51104

Construction of the Hamilton Boulevard Resurfacing Project 36th Street to City Limits Street
Infrastructure
Bidding
$1,235,000 CJ est. value
Sioux City, IA 51104

Fire Hydrant Cleaning/Painting Project
Infrastructure, Alteration
Post-Bid
Sioux City, IA

29th Street Reconstruction (Jones Street to Cheyenne Boulevard)
Infrastructure
Post-Bid
$6,150,000 CJ est. value
Sioux City, IA 51104

HMA Resurfacing with Milling
Infrastructure
Results
Sioux City, IA

PCC Patching
Infrastructure
Results

SUX Aviation Center Project Rebid
New Construction, Infrastructure - 39,400 SF
Pending Verification
$13,644,584 CJ est. value
Sioux City, IA 51111

Moville Area Medical Clinic
New Construction, Infrastructure - 10,000 SF
Pending Verification
$5,900,000 CJ est. value
Moville, IA 51039

Wastewater Treatment Plant (WWTP) Capacity Expansion - 539-223 - City of Sioux City
Addition, Infrastructure
Conception
$1,310,000 CJ est. value
Sioux City, IA 51101

Plywood Trail - 459-321 - City Of Sioux City
Infrastructure
Design
$2,000,000 CJ est. value
Sioux City, IA 51101

Moville 2nd Street Overlay
Infrastructure
Post-Bid
$350,000 est. value
Moville, IA 51039

Last Updated 07/11/2023 09:12 AM
Project Title

Alicia Avenue Paving Improvements Project

Physical Address View project details and contacts
City, State (County) Sergeant Bluff, IA 51054   (Woodbury County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,570,390 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All bids rejected by city The project is located in the Southbridge Business Park, south of Sioux Gateway Airport and includes paving Alicia Avenue from 225th Street south to the rail yard, directly east of the Cold Link Development, totaling approximately 2,500 linear feet of paving including a culde-sac at the south end. The road is currently gravel surfaced. Improvements to the road are grading, including ditch construction, storm sewer utility improvements and concrete paving (urban and rural sections). A left turn lane for westbound traffic on 225th Street is to be included as part of the improvements. As of July 11, 2023, no new information available

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents