Similar Projects
Waterline Replacement
Bidding
$25,000 to $100,000 est. value
WV

Chief Logan State Park Sewage System Upgrades
Renovation
Bidding
Logan, WV 25601

Right Fork Water Line Extension Project
Post-Bid
Danville, WV

Blennerhassett Condensing Water Piping Replacement
Post-Bid
Parkersburg, WV

Arlington/Glen Falls Water Line Improvement Project
Results
Clarksburg, WV 26301

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Steven`s Run Water Line Extension
Infrastructure
Bidding
West Milford, WV

Water Meter Improvements - Central Boaz Public Service District
Post-Bid
Vienna, WV

East Martin Street Utility Relocation
Results
$542,955 est. value
Martinsburg, WV 25401

Water System Improvements Contract Nos 1, 2, and 3
Infrastructure
Bidding
New Cumberland, WV

Water Infiltration Elimination and Construction at Morgantown High School
New Construction, Infrastructure
Post-Bid
Morgantown, WV

Proposed Water Line Replacements
Results
McMechen, WV 26040

Filter Gallery Piping Improvements
Infrastructure
Bidding
Logan, WV

Water Meters
Infrastructure
Post-Bid
Sistersville, WV

Contract #1 - Overall Water System Extension
Results
Clarksburg, WV 26422

Reported 06/10/2021 12:00 AM
Project Title

Beartown Herndon Heights Waterline Extension Project

Physical Address View project details and contacts
City, State (County) Stephenson, WV   (Wyoming County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1 – Furnishing all materials, labor, and necessary items for the construction and installation of approximately 62,658 linear feet of 6-inch and smaller diameter water main, one 140 gallons per minute existing booster station upgrade, one 100 gallons per minute new booster station, one standby generator, 23 fire hydrants, valves, individual customer services and other related appurtenances as outlined in the Plans and Specifications. Contract No. 2 – Furnishing all materials, labor, and necessary items for the construction and installation of approximately 89,944 linear feet of 8-inch and smaller diameter water main, two pressure reducing valves, 37 fire hydrants, valves, individual customer services and other related appurtenances as outlined in the Plans and Specifications. Contract No. 3 - Furnishing all materials, labor, and necessary items for the construction and installation of one 54,000 gallons water storage tank, one 70,000 gallons water storage tank and related appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents