Similar Projects
Alaska Fire Extinguishers, Suppression and Alarms Inspection and Testing
Term Contract
Design
Anchorage, AK 99501

RFP - Virtual Industry Day - Multi-discipline AE IDIQ, Alaska
Term Contract
Design
Anchorage, AK 99501

RFQ - Hazardous Materials Abatement
Term Contract
Bidding
Anchorage, AK 99505

Repair Tank Farm 3 and 4
New Construction, Renovation, Infrastructure - 4,000 SF
Bidding
$25,000,000 CJ est. value
Anchorage, AK 99505

USCIS TI Construction - AFB
New Construction - 5,100 SF
Post-Bid
$1,000,000 to $5,000,000 est. value
Anchorage, AK 99513

RFQ - Indefinite Delivery Architect-engineer Contract for Hydrographic Survey and Related Services, Various Locations
Term Contract
Post-Bid
Anchorage, AK 99501

Interior Upgrades Joint Military Mall
Renovation
Results
$100,000 to $250,000 est. value
JBER, AK 99506

Repair 176WG Wellness Center
Renovation
Results
$100,000 to $250,000 est. value
JBER, AK

Police Security Alarm Monitoring and Maintenance Alaska VA Health Care System
Term Contract
Design
Anchorage, AK 99504

Repair Interior of Chapel B3
Renovation
Bidding
$250,000 CJ est. value
Anchorage, AK 99505

RFQ - IDAE Mechanical Engineering
LEED Certification, Term Contract
Post-Bid
$1,000,000 CJ est. value
Anchorage, AK 99505

Add/Alter Engine Test Facility, B15437, JBER
Renovation
Results
$542,000 CJ est. value
Anchorage, AK 99506

Install Electrical Service B10571
Renovation
Design
$500,000 CJ est. value
Anchorage, AK 99505

RFQ Contractor - Multi Site MAR Tower Fire Suppression, Alaska Radar System (ARS), Various Locations, Alaska
Renovation
Post-Bid
$25,000,000 CJ est. value
Anchorage, AK 99501

Repair 176MDG Command Suite and Various Entrances
Renovation
Results
$72,141 CJ est. value
Anchorage, AK 99505

Last Updated 07/12/2023 04:34 AM
Project Title

Repair Inadequate Sprinkler Coverage Basement Exit Stairwell B690

Physical Address View project details and contacts
City, State (County) Anchorage, AK 99505   (Anchorage County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: Provide repairs for building 690 as noted in statement of work and on the attached drawings. Project consists of adding sprinklers in the exit stairwell, installation of new 1 hour fire rated door at existing opening, and installation of baseboard heating. There has not been asbestos containing material (ACM) or lead based paint (LBP) detected in this area of the facility. If ACM or LBP is detected in areas of repair, contact 673 CONS Contracting Officer. Whenever remediation is required, it shall be limited to the minimum area necessary to satisfactorily complete the associated repair. The Contractor shall provide 95% design for review and approval by the Government prior to construction. Contractor shall complete to 100% design and construction. The subject project Magnitude of Construction in accordance with FAR 36.204(b) between $25,000 and $100,000. Project Location: Building 690, Joint Base Elmendorf-Richardson (JBER), AK *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 06/27/2023 at 10:00 AM AKT All questions are due

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents