Similar Projects
2021 Sanitary Manhole Rehabilitation
Infrastructure
Bidding
Lawrence, KS

Naismith Valley Interceptor Sewer and Abandonment of Pump Station 8
Alteration
Post-Bid
Lawrence, KS

Sanitary Sewer Extension to Serve Boulevard East Addition
Infrastructure
Post-Bid
Wichita, KS

Whispering Meadows Unit Seven, Sewer, Water, And Street Improvements
Results
KS

Cured in Place Pipe Project
Results
Gardner, KS

On-Call Emergency Wastewater Collection System Repair Services
Infrastructure
Post-Bid
KS

2020 Sanitary Sewer Improvements
Results
Mayetta, KS

Manhole Covers, Frames and Catch Basin Inlet Grates and Frames for WPC
Infrastructure
Post-Bid
Kansas City, KS

Cured in Place Pipe Rehabilitation
Term Contract
Results
Gardner, KS

2021 Sanitary Sewer Rehabilitation Phase A1
Infrastructure
Post-Bid
Wichita, KS

Manhole Rehab and Reconstruction
Infrastructure
Results
Wichita, KS

Lakeview Court Sanitary Sewer Repair
Infrastructure
Post-Bid
Leavenworth, KS

Fifth Street Sanitary Sewer Improvements
Infrastructure
Results
Gypsum, KS

2021 Sanitary Sewer Repair and Replacement
Infrastructure
Post-Bid
Kansas City, KS

Brook Ridge Unit Four Sewer, Water and Street Improvements
Infrastructure
Results
$408,010 est. value
Lenexa, KS

Last Updated 12/23/2021 02:12 PM
Project Title

Phase 2 Basin M6 Sanitary Sewer Rehabilitation and Improvements Project

Physical Address View project details and contacts
City, State (County) Olathe, KS   (Johnson County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pipe burst approximately 513 LF of 8” HDPE gravity sewer pipe. Install approximately 891 LF of 8” PVC gravity sewer pipe. Install approximately 2,280 LF of 8” Cured-In-Place Pipe lining (CIPP). Install approximately 222 LF of 12” Cured-In-Place Pipe lining (CIPP). Install 16 – 48” diameter manholes. Rehabilitation of 5 – 48” Diameter manholes. Replace approximately 199 LF of service laterals. Install 24 service lateral liners. Reconnect sanitary sewer laterals, complete all site work, and complete all site restoration incident to the sewer improvements.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents