Reported | 12/17/2021 12:00 AM |
Project Title | Repairs to Electrical, Plumbing, HVAC |
Physical Address | View project details and contacts |
City, State (County) | Charlotte, NC (Cabarrus County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric, HVAC, Plumbing |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of the project is to replace an existing pad-mounted medium voltage transformer, switchboard, and generator that feed the McEniry building, McMillian Greenhouse, and the Solvent Storage Building. To limit downtime, the new equipment will be set and made operational, the loads will be moved over one by one, and then the existing equipment will be demolished. The project is divided into multiple phases and all outages will be closely coordinated with the University. The scope of the project is primarily exterior work. The equipment to be demolished includes a boiler and associated building, a generator and associated building, a standalone generator, a pad-mounted medium voltage transformer, a switchboard, panelboards, automatic transfer switches, and various feeders, boxes, and circuitry. The new equipment includes a pad-mounted medium voltage switchboard, an exterior switchboard, a generator, a generator docking station, automatic transfer switches, panelboards, concrete-encased duct banks, hand-holes, and various feeders, boxes and circuitry. Additionally, electrical support for a separate project is in the scope of this project and the work in this project will need to be coordinated with that project. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |