Similar Projects
City Hall Annex Electric Boiler
Alteration
Bidding
$75,000 est. value
Cambridge, MA 02139

Install Point of Entry Water Filtration System
Alteration
Bidding
$800,000 est. value
Tewksbury, MA 01876

Repair and Maintenance of Refrigeration System at Ice Rink
Post-Bid
Somerville, MA

Region 1 Chiller System Glycol Upgrade
Post-Bid
Less than $25,000 est. value
Maynard, MA 01754

Replacement of Filters at Kennedy Pool
Term Contract
Results
$120,000 est. value
Somerville, MA 02143

Top of Shafts 6, 8 and 9 Interim Improvements
Results
Less than $4,177,000 est. value
Brighton, Malden, Newton, MA

On-Call Hourly Rate Boiler Service
Post-Bid
Hudson, MA

Temporary Modular Boiler for the City Hall
Results
Somerville, MA 02143

Saturated Steam Retort
Post-Bid
Natick, MA 01760

Hot Water System Flushing
Results
$45,140 est. value
Dracut, MA

Hot Water Heater Replacement - General Bids
Post-Bid
Less than $500,000 est. value
Tewksbury, MA 01876

Boiler Replacement at the Watertown Middle School - General Bid
Results
Less than $1,100,000 est. value
Watertown, MA 02472

Hot Water Heater Replacement - Filed Sub Bids
Post-Bid
Less than $500,000 est. value
Tewksbury, MA 01876

Heating System Distribution Pump and Selected Piping Replacement at Prospect Terrace 200-1
Results
$256,000 est. value
Waltham, MA 02451

H345--Boiler Plant Controls Calibration and Testing Services.
Post-Bid
Bedford, MA 01730

Reported 11/19/2021 12:00 AM
Project Title

Remove and Replace Exiting Air Stripper Packing Media

Physical Address View project details and contacts
City, State (County) Sudbury, MA   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 10/28/21
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract shall include all labor, equipment, and materials furnished and installed as specified herein or indicated on the drawings to remove and replace exiting air stripper packing media in an existing air stripper at the Raymond Road Water Treatment Plant for the Sudbury Water District. Scope of work also includes cleaning and visual inspection of the air stripper interior.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents