Similar Projects
Highway 32 Sidewalk and Drainage Improvement Project
Infrastructure
Bidding
Nicholls, GA 31554

Augusta Canal - Bulkhead Gate Repair
Infrastructure
Bidding
Augusta, GA

Crossgate Subdivision Drainage Improvements
Post-Bid
Guyton, GA 31312

CDBG Engineering Services
Post-Bid
Alma, GA

Knight Road Culvert Replacement
Results
Rutledge, GA 30663

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

Greensferry Stream and Floodplain Restoration Project
Infrastructure
Bidding
Atlanta, GA

Grayland Hills Drive Drainage
Post-Bid
Lawrenceville, GA 30046

Pike County CDBG19 - Storm Drainage and Street Improvements, Hill Top Community
Results
Less than $515,000 est. value
Zebulon, GA 30295

Fiscal Year 2022 LMIG EEE Project
Infrastructure
Bidding
GA

Street and Drainage Improvements to Oak Lane
Post-Bid
Less than $250,000 est. value
Argyle, GA 31623

Installation of Street and Drainage Improvements to Velie Road
Results
Less than $135,510 est. value
Nahunta, GA 31553

Design Build Services Culvert Replacements
Infrastructure
Bidding
Gainesville, GA

Site Pavement and Erosion Repair
Post-Bid
Savannah, GA

Drainage Improvement for Denmark Fitness Center
Results
Forsyth, GA 31029

Last Updated 04/14/2022 08:09 AM
Project Title

2022 Drainage Improvements

Physical Address View project details and contacts
City, State (County) Albany, GA   (Dougherty County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of this project is to furnish all labor, materials and equipment necessary to provide for stormwater drainage improvements at four different locations throughout Dougherty County. Project involves installation of approximately 620 LF of storm drain piping, 3 headwalls, 8 drainage structures, one flap gate, grading and associated riprap, erosion control with all related accessories as shown on the plans and called for in the specifications.

Details

Division 02 - Existing Conditions.
Division 03 - Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents