Similar Projects
St Lucie County Rock Road Jail Pods A1-A4 Roof and HVAC Replacement
Alteration
Bidding
Fort Pierce, FL 34945

Pedro Menendez High School 400 Wing Roof Replacement
Alteration
Bidding
Saint Augustine, FL 32086

Roof Replacement at Omega Apartments
Post-Bid
Orlando, FL 32810

Garcon Point Roof Replacement and Gutter and Downspout Repair
Post-Bid
Milton, FL 32583

City Barn Roof and Interior Repairs
Results
Less than $38,774 est. value
Frostproof, FL 33843

Roofing Preventative Maintenance and Remedial Repairs
Term Contract
Results
Less than $500,000 est. value
Naples, FL

Roof Repair / Replacement at Palm Lake Village Apartments
Alteration
Bidding
Dunedin, FL 34698

Residential Roofing Work
Post-Bid
Orlando, FL 32800

Escambia County CRA Income-Based Roof Program
Results
Pensacola, FL 32501

Roof Repair/Replacement (Building 1) at Middleburg High School
Alteration
Bidding
Middleburg, FL 32068

Building 0092 Physics Re-Roof Phase 3
Post-Bid
Gainesville, FL

C.A. Weis Elementary Roof Replacement
Results
Less than $3,018,900 est. value
Pensacola, FL 32505

West Volusia Transfer Station Roof Replacement
Alteration
Bidding
$200,000 est. value
Deland, FL 32724

Guttering System Installation Services
Term Contract
Post-Bid
Clewiston, FL

Ortiz Jail Core II Re-roof
Term Contract
Results
Fort Myers, FL 33905

Reported 03/23/2022 12:00 AM
Project Title

Fred Wild Elementary Building 7 Reroof

Physical Address View project details and contacts
City, State (County) Sebring, FL 33870   (Highlands County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish all material, labor and equipment to reroof building 7 at Fred Wild Elementary School in Sebring. Demo existing roof membrane. Demo of the existing roof will not include the asbestos transite panels that make up the exposed surface on all the building overhangs and covered walks. The School Board will contract with others to have the transite removed and disposed of prior to roof work under this contract beginning. The contractor will still be responsible for the removal of any steel supports that make up the structure for the covered walk and overhangs. Remove sufficient brick that makes up the old boiler chimney exhaust to get the structure below the current roof plain. Provide a steel plate, of sufficient thickness (obtain owner approval for desired thickness) and dimension to bridge opening created by chimney and have it fully be supported on existing roof trusses

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents