Similar Projects
FPL Avenir Substation
New Construction - 540 SF
Design
Less than $500,000 CJ est. value
West Palm Beach, FL 33412

Palm Beach International Airport Switchgear NPDS Replacement
Renovation
Bidding
West Palm Beach, FL 33415

Specifications To Remove And Replace Diesel Generator
Renovation
Post-Bid
Marathon, FL

Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4.
Post-Bid
$1,000,000 to $5,000,000 est. value
Orlando, FL

Hord Substation Third Transformer Addition Project
New Construction
Results
Less than $1,200,000 est. value
Kissimmee, FL 34741

Normandy Substation APSTF Protection and Controls Project
Results
Jacksonville, FL 32221

Engineer And Replace Overhead Shield Wire With Optical Ground Wire
Renovation
Post-Bid
Tavernier, FL

Stock Island Generating Facility Maintenance Services
Term Contract
Results
Stock Island, FL 33040

Emergency Power Restoration
Renovation
Post-Bid
Live Oak, FL

Chapman Substation Construction Work
Results
Green Cove Springs, FL

Emergency Assistance for Power Restoration - (Distribution / Transmission / Substation)
Renovation
Post-Bid
Keystone Heights, FL

Wauchla Substation Construction
Results
Wauchula, FL 33873

Cane Island Substation 230kV Bay 1 Upgrade Construction
Results
Davenport, FL 33896

Electrical Substation Modifications and Various Construction Services
Results
Key West, FL

Repair Cable and Splices in Feeder from North Substation, Cape Canaveral Space Force Station, FL
Results
Cape Canaveral, FL

Last Updated 02/04/2022 09:37 AM
Project Title

Park and King Substation Construction Services

Physical Address View project details and contacts
City, State (County) Jacksonville, FL   (Duval County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Services for JEA’s Park and King substation as described in this Solicitation (the "Work") and to determine the best method for JEA to procure the Work with regards to pricing, quality, design, and workmanship. Over the past three decades, JEA has been implementing a plan to retire the 4KV distribution system. In 2015 the 4KV conversion plan was re-evaluated. The findings were that conversion was still justified in some areas, but in other areas it made more sense to refurbish and keep the 4KV. The modified plan refurbishes six 4KV substations and associated circuits. The Park and King 4KV substation is one of the stations selected to remain in service and will be rebuilt. It is the fifth of the six stations, and only one more will remain to be rebuilt after it.

Details

Electric Substation, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents