Similar Projects
Relief Wells at Wood River Levee District - USACE St. Louis
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Wood River, IL 62095

Thickened Sludge Pump Replacement - Building 390 Clavey Road WRF
Infrastructure
Bidding
Highland Park, IL

Raw Water Well
New Construction, Infrastructure
Bidding
$209,000 est. value
Eddyville, IL

Submersible Explosion Proof Pumps
Post-Bid
Wheaton, IL 60187

Replacement OEM Moyno Pump Parts
Term Contract
Post-Bid
Waukegan, IL 60085

Phase 2 Installation of Monitoring Wells and Probes
Renovation
Results
Hanover Park, IL 60133

Northwest Waterworks Booster Pump VFD Installation and South Operations Center Pump VFD Replacement
Results
Naperville, IL 60540

Well #16 Maintenance and Repair
Infrastructure
Bidding
Crystal Lake, IL

Pumping Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Naperville, IL 60540

Improvements to City Well Number 31
Results
Naperville, IL 60540

Hatchery Well Pump and Motor Replacement
Infrastructure
Bidding
Marseilles, IL 61341

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Barrington HS Sewage Ejector Pump Replacement
Results
Barrington, IL 60010

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

Well and Well House No. 3
Results
Less than $1,602,700 est. value
Pecatonica, IL 61063

Last Updated 11/01/2021 04:47 PM
Project Title

Well No. 5 Pump Replacement

Physical Address View project details and contacts
City, State (County) Peru, IL   (La Salle County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $140,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Converting existing Well No. 5 pump equipment from oil lube line shaft to submersible.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents