Similar Projects
Figueroa Ave WPCF Facility Improvements
Renovation
Conception
$61,500,000 est. value
Yuma, AZ 85364

Constructed Recharge Facility
New Construction
Conception
$1,750,000 est. value
Casa Grande, AZ

Central WWTP Improvements Phase 2
Renovation
Design
$1,000,000 est. value
Buckeye, AZ

Water Reclamation Facility #6 Phase 1
New Construction
Design
$12,000,000 est. value
Buckeye, AZ

Major Lift Station Upgrades Construction Project
New Construction
Bidding
$2,000,000 to $5,000,000 est. value
Sedona, AZ

Construction of the New Sahuarita Water Reclamation Facility Lab
New Construction - 1,320 SF
Bidding
Sahuarita, AZ 85629

Vistancia Pump Station Conversion - Zone 5/6 To Zone 6/7
Post-Bid
Scottsdale, AZ 85383

Chaparral Pines Lift Station No. 3 Replacement
Post-Bid
Gisela, AZ 85541

Design-Build Services For Waddell Pumping Plant Plc-5 Replacement Project
Results
Less than $3,150,000 est. value
Phoenix, AZ

Luke Air Force Base Lift Station Construction Manager at Risk Services
Results
$3,000,000 est. value
Glendale, AZ 85301

Transfer Station
New Construction - 10,500 SF
Pending Verification
Gilbert, AZ

WRF Expansion Construction
New Construction
Conception
$1,800,000 est. value
Casa Grande, AZ

Wastewater Treatment Plant Headworks Improvements
Renovation
Design
Phoenix, AZ

Avondale 10th Street Force Main Replacement CMAR
Infrastructure
Bidding
$1,250,000 est. value
Avondale, AZ 85323

Wastewater Treatment Plant, Biosolids Transport and Disposal
Term Contract
Post-Bid
Show Low, AZ

Last Updated 01/07/2022 03:38 PM
Project Title

Construction Manager at Risk for the Constructed Recharge Facility

Physical Address View project details and contacts
City, State (County) Casa Grande, AZ 85122   (Pinal County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor selected for this project shall review plans and provide value engineering feedback to the Design Engineer throughout the design process. Contractor shall then be responsible for construction of the facility, which will include earthwork, underground piping to deliver effluent to each pond, underground electrical and instrumentation conduits and conductors, and installation of a pumping station.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts