Similar Projects
USACE SPK DBB Construction - Lower American River, Site 2-1
Renovation, Term Contract
Design
$25,000,000 to $100,000,000 est. value
Sacramento, CA 95825

Install Rockfall Drapery Systems & roadway excavation.
Infrastructure
Bidding
$8,000,000 est. value

Install Rockfall Drapery Systems & roadway excavation.
Infrastructure
Bidding
$8,000,000 est. value

Levee Maintenance Project
Infrastructure
Post-Bid
Stockton, CA 95214

Citywide Flood Protection Maintenance
Infrastructure
Post-Bid
Paso Robles, CA

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Fisher Basin Expansion Project
Term Contract
Bidding
$1,450,000 est. value
Morgan Hill, CA 95037

Repair Failing Slope
Infrastructure
Post-Bid
$275,400 est. value
CA

Compost Leachate Pond Improvements
Renovation
Results
$1,900,000 est. value
Auburn, CA 95603

Construct Rock Slope Protection, Fish Passage and Bridge Rail
Infrastructure
Bidding
$3,340,000 est. value
CA

Roadway Excavation, Place HMA (Type A), and Alternative Pipe Culvert
Infrastructure
Post-Bid
$76,000,000 est. value
Olancha, CA

County Roadway Drainage Improvement Project
Infrastructure
Results
CA

CA FLAP MAD CR26(1) ET AL Avenue 26 and Road 29
Infrastructure, Alteration
Bidding
$16,000,000 to $21,000,000 est. value
Madera, CA

On-Call Emergency Facilities Repair Services
Infrastructure
Post-Bid
$25,000,000 est. value
CA 91803

Last Updated 11/05/2021 02:13 AM
Project Title

Ground Anchor, Roadway Excavation and Timber Lagging

Physical Address View project details and contacts
City, State (County) CA   (Mendocino County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $19,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

LOCATION - 01-Men-162-11.5/11.8 Mendocino County Near Dos Rios From 1.4 Miles To 1.7 Miles East Of Rodeo Creek Bridge 1 070030 Lead Compliance Plan Ls Lump Sum 2 080050 Progress Schedule (Critical Path Method) Ls Lump Sum 3 090105 Time-Related Overhead (Ls) Ls Lump Sum 4 090205 Dispute Resolution Board On-Site Meeting Ea 8 5 090210 Hourly Off-Site Dispute-Resolution-Board-Related Tasks Hr 40 6 120090 Construction Area Signs Ls Lump Sum 7 120100 Traffic Control System Ls Lump Sum 8 120120 Type Iii Barricade Ea 18 9 120151 Temporary Traffic Stripe (Tape) Lf 2,060 10 120165 Channelizer (Surface Mounted) Ea 110 11 120198 Plastic Traffic Drums Ea 50 12 128652 Portable Changeable Message Sign (Ls) Ls Lump Sum 13 129000 Temporary Railing (Type K) Lf 2,320 14 012343 Alternative Temporary Crash Cushion Ea 8 15 130100 Job Site Management Ls Lump Sum 16 130300 Prepare Storm Water Pollution Prevention Plan Ls Lump Sum 17 130310 Rain Event Action Plan Ea 62 18 130320 Storm Water Sampling And Analysis Day Ea 120 19 130330 Storm Water Annual Report Ea 3 20 130505 Move-In/Move-Out (Temporary Erosion Control) Ea 12 21 130520 Temporary Hydraulic Mulch Sqyd 7,640 22 130530 Temporary Hydraulic Mulch (Bonded Fiber Matrix) Sqyd 2,220 23 130540 Temporary Tacked Straw Sqyd 2,300 24 130570 Temporary Cover Sqyd 2,220 25 130610 Temporary Check Dam Lf 300 26 130620 Temporary Drainage Inlet Protection Ea 2 27 130640 Temporary Fiber Roll Lf 9,750 28 130650 Temporary Gravel Bag Berm Lf 180 29 130680 Temporary Silt Fence Lf 3,200 30 130710 Temporary Construction Entrance Ea 5 31 130730 Street Sweeping Ls Lump Sum 32 130900 Temporary Concrete Washout Ls Lump Sum 33 146002 Contractor-Supplied Biologist (Ls) Ls Lump Sum 34 160110 Temporary High-Visibility Fence Lf 360 35 170103 Clearing And Grubbing (Ls) Ls Lump Sum 36 190101 Roadway Excavation Cy 33,100 37 047865 (F) - Structure Excavation (Pile Cap) Cy 201 38 192049 (F) - Structure Excavation (Soldier Pile Wall) Cy 4,084 39 047866 (F) - Structure Backfill (Pile Cap) Cy 142 40 193029 (F) - Structure Backfill (Soldier Pile Wall) Cy 208 41 193116 (F) - Concrete Backfill (Soldier Pile Wall) Cy 598 42 047867 (F) - Concrete Backfill (Shear Pile Wall) Cy 512 43 193119 (F) - Lean Concrete Backfill Cy 1,015 44 198209 Subgrade Enhancement Geotextile, Class B2 Sqyd 5,960 45 203100 Soil Testing Ea 1 46 210252 Bonded Fiber Matrix (Sqft) Sqft 118,000 47 210270 Rolled Erosion Control Product (Netting) Sqft 119,000 48 210350 Fiber Rolls Lf 8,820 49 210610 Compost (Cy) Cy 430 50 390132 Hot Mix Asphalt (Type A) Ton 3,050 51 393004 Geosynthetic Pavement Interlayer (Paving Fabric) Sqyd 300 52 394073 Place Hot Mix Asphalt Dike (Type A) Lf 1,360 53 394077 Place Hot Mix Asphalt Dike (Type F) Lf 170 54 397005 Tack Coat Ton 4.7 55 460210 Ground Anchor (Subhorizontal) Ea 610 56 047868 Steel Soldier Pile (Hp 14x89) Lf 8,498 57 047869 Steel Soldier Pile (W 21x122) Lf 3,318 58 490403 30" Drilled Hole Lf 11,670 59 047870 (F) - Structural Concrete, Waler Cy 760 60 047871 (F) - Structural Concrete, Pile Cap Cy 145 61 510072 (F) - Structural Concrete, Barrier Slab Cy 422 62 047872 (F) - Bar Reinforcing Steel (Pile Cap) Lb 11,419 63 047873 (F) - Bar Reinforcing Steel (Waler) Lb 361,241 64 575004 (F) - Timber Lagging Mfbm 167 65 590120 Clean And Paint Steel Soldier Piling Ls Lump Sum 66 680404 8" Perforated Steel Pipe Underdrain Lf 300 67 680604 8" Non-Perforated Steel Pipe Underdrain Lf 340 68 681501 Furnish And Install Drain Pipe (Horizontal Drain) Lf 1,650 69 681502 Drill Hole (Horizontal Drain) Lf 1,650 70 047874 Class 3 Permeable Material Cy 1,651 71 723080 Rock Slope Protection (60 Lb, Class Ii, Method B) (Cy) Cy 13 72 729011 Rock Slope Protection Fabric (Class 8) Sqyd 50 73 760010 Destroy Well Ea 12 74 780440 Prepare And Stain Concrete Sqft 8,527 75 012344 Temporary Debris Containment Fence Lf 700 76 810120 Remove Pavement Marker Ea 36 77 810170 Delineator (Class 1) Ea 29 78 810190 Guard Railing Delineator Ea 14 79 810250 Pavement Marker (Retroreflective-Recessed) Ea 150 80 820112 Marker (Culvert) Ea 6 81 832011 Midwest Guardrail System (Special) Lf 38 82 832018 Midwest Guardrail System (8' Steel Post) Lf 460 83 832070 Vegetation Control (Minor Concrete) Sqyd 290 84 047875 Tubular Bicycle Railing (Modified) Lf 659 85 839543 Transition Railing (Type Wb-31) Ea 2 86 839584 Alternative In-Line Terminal System Ea 2 87 047876 (F) - Concrete Barrier(Type 85 Modified) Lf 659 88 840516 Thermoplastic Pavement Marking (Enhanced Wet Night Visibility) Sqft 74 89 846007 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) Lf 8,850 90 846030 Remove Thermoplastic Traffic Stripe Lf 4,460 91 846035 Remove Thermoplastic Pavement Marking Sqft 24 92 872002 Temporary Signal Systems Ls Lump Sum 93 999990 Mobilization Ls Lump Sum

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents