Similar Projects
Performing Arts Annex, Gymnasium & Athletic Turf Field
New Construction
Conception
$30,000,000 est. value
Chicago, IL 60618

U Of C Arts Lawn Phase 2
Alteration - 40,700 SF
Design
Chicago, IL 60637

Renovate Classroom 250 at Science and Engineering South - Bid Package - Division 01
Renovation
Post-Bid
Chicago, IL 60607

Des Plaines Cafeteria
Renovation
Post-Bid
Des Plaines, IL 60016

Restroom Renovations Phase 3
Renovation
Results
Chicago Heights, IL 60411

Building M Hall of Fame
Results
Palatine, IL 60067

Harper College University Center Building
Pending Verification
$83,000,000 est. value
Palatine, IL 60067

3601 N California Mixed Use
New Construction, Demolition - 2,500 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Chicago, IL 60618

Renovate Classroom 250 at Science And Engineering South - Bid Package - Division 05
Renovation
Post-Bid
Chicago, IL 60607

Third Floor Renovations - Building E
Renovation
Results
River Grove, IL 60171

The Hub Incubator & Lab Building Renovation
Renovation
Pending Verification
Evanston, IL

5th Floor Auditorium - CMET
Post-Bid
Chicago, IL 60612

Center for Multicultural Learning
Renovation, Demolition - 2,000 SF
Results
Palatine, IL 60067

Y211 Server Room Improvements
Post-Bid
Palatine, IL 60067

Building P Police Locker Rooms
Renovation - 750 SF
Results
Palos Hills, IL 60465

Last Updated 01/19/2022 07:28 AM
Project Title

OCC Mechanical Room Cooling - General Work

Physical Address View project details and contacts
City, State (County) Chicago, IL 60612   (Cook County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install a new cooling system serving the basement mechanical room C114. The new system is comprised of a small modular AHU, separate exhaust fan, ductwork, supporting hydronic and electrical work, and DDC temperature controls. A new mechanical duct shaft will be routed from the basement mechanical room, through a janitorial space on the 1st floor, and terminate at new exterior louvers ont he south side of the building. The installation pathway for the new equipment is through existing precast concrete panels located on grade at the south side of the building on Fillmore Street. These panels will be removed, restored, and reinstalled in a weathertight manner. This portion of the scope needs to be coordinated with the facility in order to lessen the impact to the ADA entrance directly above. This project also includes repairs to a structural beam and associated structural members. Refer to the structural drawings for the nature of the scope. Unit pricing is also requested as part of this scope. Finally, this project includes a bid alternate for additional demolition of legacy mechanical equipment including absorption chillers, pumps, and accessories.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents